Menu Close
- CONSTRUCTION
- HOMEBUILDER
- ENERGY
- MORE
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
- SAFETY APP
- CONSTRUCTION
- HOMEBUILDER
- ENERGY
- MORE
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
- SAFETY APP
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
The Division 05 checklist index brings every existing conditions checklist into one place. Use this index to navigate the full list of existing conditions checklists available on the FTQ360 inspection and QAQC platform.
| Spec Section | Title | Description |
|---|---|---|
| 05.00.00 | Metals | Metals describing equipment, materials, and methods necessary to provide a complete, code-compliant installation integrated with adjacent systems. Activities coordinated with other trades and verified prior to acceptance. |
| 05.01.00 | Maintenance of Metals | Maintenance of Metals addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, after, metal, primer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.01.10 | Maintenance of Structural Metal Framing | Maintenance of Structural Metal Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes repair, fastening, coatings, members, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.01.20 | Maintenance of Metal Joists | Maintenance of Metal Joists addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes joist, coatings, new, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.01.30 | Maintenance of Metal Decking | Maintenance of Metal Decking addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes deck, welds, coatings, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.01.40 | Maintenance of Cold- Formed Metal Framing | Maintenance of Cold-Formed Metal Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, stud, coldformed, studs, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.01.50 | Maintenance of Metal Fabrications | Maintenance of Metal Fabrications addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, mil, verified, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.01.70 | Maintenance of Decorative Metal | Maintenance of Decorative Metal addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, metal, decorative, cleaning, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.01.70.91 | Historic Treatment of Decorative Metal | Historic Treatment of Decorative Metal addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes cleaning, coatings, specified, prevent, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.03.00 | Conservation Treatment for Period Metals | Conservation Treatment for Period Metals addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes metal, cleaning, approved, water, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.03.12 | Conservation Treatment for Period Structural Steel | Conservation Treatment for Period Structural Steel addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes steel, coatings, members, cleaning, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.03.12.13 | Conservation Treatment for Period Architecturally Exposed Steel | Conservation Treatment for Period Architecturally Exposed Steel addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, steel, conservation, approved, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.03.12.23 | Conservation Treatment for Period Structural Steel for Buildings | Conservation Treatment for Period Structural Steel for Buildings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes steel, coatings, member, thickness, with field verification confirming compliance with performance, safety, and quality standards. |
| 05.03.51 | Conservation Treatment for Period Metal Stairs | Conservation Treatment for Period Metal Stairs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes metal, coatings, testing, stair, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.03.58 | Conservation Treatment for Period Column Covers | Conservation Treatment for Period Column Covers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes metal, column, coatings, cleaning, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.03.70 | Conservation Treatment for Period Decorative Metal | Conservation Treatment for Period Decorative Metal addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, cleaning, original, conservation, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.03.71 | Conservation Treatment for Period Decorative Metal Stairs | Conservation Treatment for Period Decorative Metal Stairs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes approved, metal, stair, coatings, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.03.73 | Conservation Treatment for Period Decorative Metal Railings | Conservation Treatment for Period Decorative Metal Railings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes railing, coatings, leaving, historic, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.03.75 | Conservation Treatment for Period Decorative Formed Metal | Conservation Treatment for Period Decorative Formed Metal addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, metal, decorative, preventing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.03.76 | Conservation Treatment for Period Decorative Forged Metal | Conservation Treatment for Period Decorative Forged Metal addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes metal, cleaning, coatings, before, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.05.00 | Common Work Results for Metals | Common Work Results for Metals addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, metal, primer, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.05.05 | Selective Demolition for Metals | Selective Demolition for Metals addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes metal, demolition, removal, coatings, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.05.13 | Shop-Applied Coatings for Metal | Shop-Applied Coatings for Metal addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, mil, testing, prior, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.05.19 | Post-Installed Concrete Anchors | Post-Installed Concrete Anchors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, manufacturer, anchors, adhesive, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.05.23 | Metal Fastenings | Metal Fastenings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, specified, fasteners, approved, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.05.53 | Security Metal Fastenings | Security Metal Fastenings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes security, fastening, specified, anchors, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.06.00 | Schedules for Metals | Schedules for Metals addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, metal, fastening, structural, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 05.06.10 | Schedules for Structural Metal Framing | Schedules for Structural Metal Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, member, size, match, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 05.06.10.13 | Steel Column Schedule | Steel Column Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes column, scheduling, length, before, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 05.06.10.16 | Steel Beam Schedule | Steel Beam Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, beam, beams, scheduled, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 05.06.20 | Schedules for Metal Joists | Schedules for Metal Joists addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes joist, scheduling, scheduled, matches, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 05.06.20.13 | Steel Joist Schedule | Steel Joist Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, joist, steel, length, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 05.06.30 | Schedules for Metal Decking | Schedules for Metal Decking addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, deck, each, type, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 05.06.40 | Schedules for Cold- Formed Metal Framing | Schedules for Cold-Formed Metal Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes studs, scheduling, spacing, scheduled, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 05.06.50 | Schedules for Metal Fabrications | Schedules for Metal Fabrications addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, fabrication, metal, each, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 05.06.70 | Schedules for Decorative Metal | Schedules for Decorative Metal addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes decorativemetal, scheduling, scheduled, location, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables, coordinated schedules. |
| 05.08.00 | Commissioning of Metals | Commissioning of Metals addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes metal, testing, all, coatings, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.10.00 | Structural Metal Framing | Structural Metal Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes approved, before, column, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.12.00 | Structural Steel Framing | Structural Steel Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, inch, erection, before, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.12.13 | Architecturally- Exposed Structural Steel Framing | Architecturally-Exposed Structural Steel Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes aess, inch, visible, steel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.12.16 | Fabricated Fireproofed Steel Columns | Fabricated Fireproofed Steel Columns addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fireproofing, column, specified, thickness, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.12.19 | Buckling Restrained Braces | Buckling Restrained Braces addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes brb, end, plates, plate, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.12.23 | Structural Steel for Buildings | Structural Steel for Buildings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes before, approved, erection, full, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.12.33 | Structural Steel for Bridges | Structural Steel for Bridges addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, erection, fastening, before, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.13.00 | Structural Stainless- Steel Framing | Structural Stainless-Steel Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes stainlesssteel, approved, match, documentation, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. |
| 05.14.00 | Structural Aluminum Framing | Structural Aluminum Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes aluminum, fastening, holes, framing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.14.13 | Architecturally- Exposed Structural Aluminum Framing | Architecturally-Exposed Structural Aluminum Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, aluminum, members, structural, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.15.00 | Wire Rope Assemblies | Wire Rope Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes rope, diameter, wire, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.15.13 | Aluminum Wire Rope Assemblies | Aluminum Wire Rope Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes rope, sleeves, tension, prevent, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.15.16 | Steel Wire Rope Assemblies | Steel Wire Rope Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes rope, wire, testing, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.15.19 | Stainless-Steel Wire Rope Assemblies | Stainless-Steel Wire Rope Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes rope, grade, tension, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.16.00 | Structural Cabling | Structural Cabling addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes cable, specified, coatings, diameter, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.16.13 | Cable Bow Truss Assemblies | Cable Bow Truss Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes cable, testing, fastening, design, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.16.33 | Bridge Cabling | Bridge Cabling addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes cable, specified, final, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.17.00 | Structural Rod Assemblies | Structural Rod Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes rod, specified, rods, tensioning, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.19.00 | Tension Rod and Cable Truss Assemblies | Tension Rod and Cable Truss Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, fastening, final, rod, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.19.13 | Façade Support Truss Assemblies | Façade Support Truss Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes truss, specified, before, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.19.19 | Canopy Support Truss Assemblies | Canopy Support Truss Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, truss, canopy, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.20.00 | Metal Joists | Metal Joists addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes joist, bearing, bridging, chords, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.21.00 | Steel Joist Framing | Steel Joist Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes joist, fastening, bridging, bearing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.21.13 | Deep Longspan Steel Joist Framing | Deep Longspan Steel Joist Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes joist, welds, fastening, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.21.16 | Longspan Steel Joist Framing | Longspan Steel Joist Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes joist, bearing, required, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.21.19 | Open Web Steel Joist Framing | Open Web Steel Joist Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes joist, deck, bearing, bridging, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.21.23 | Steel Joist Girder Framing | Steel Joist Girder Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes girder, joist, specified, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.25.00 | Aluminum Joist Framing | Aluminum Joist Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes joist, fastening, aluminum, locations, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.30.00 | Metal Decking | Metal Decking addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes deck, specified, concrete, panels, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.31.00 | Steel Decking | Steel Decking addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes deck, specified, concrete, steel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.31.13 | Steel Floor Decking | Steel Floor Decking addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes deck, concrete, coatings, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.31.23 | Steel Roof Decking | Steel Roof Decking addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes deck, each, pattern, approved, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.31.33 | Steel Form Decking | Steel Form Decking addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes deck, welds, structural, weld, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.33.00 | Aluminum Decking | Aluminum Decking addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes decking, aluminum, panels, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.33.13 | Aluminum Floor Decking | Aluminum Floor Decking addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes deck, supports, screws, panels, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.33.23 | Aluminum Roof Decking | Aluminum Roof Decking addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes deck, roof, fasteners, aluminum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.34.00 | Acoustical Metal Decking | Acoustical Metal Decking addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes deck, required, specified, panels, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.35.00 | Raceway Decking Assemblies | Raceway Decking Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes decking, raceway, electrical, concrete, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.36.00 | Composite Metal Decking | Composite Metal Decking addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes deck, concrete, structural, than, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.36.13 | Composite Steel Plate and Elastomer Decking | Composite Steel Plate and Elastomer Decking addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes decking, thickness, plate, inches, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.40.00 | Cold-Formed Metal Framing | Cold-Formed Metal Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes stud, track, screws, studs, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.41.00 | Structural Metal Stud Framing | Structural Metal Stud Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes stud, spacing, wall, required, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.42.00 | Cold-Formed Metal Joist Framing | Cold-Formed Metal Joist Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes joist, joists, approved, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.42.13 | Cold-Formed Metal Floor Joist Framing | Cold-Formed Metal Floor Joist Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes joist, joists, minimum, spacing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.42.23 | Cold-Formed Metal Roof Joist Framing | Cold-Formed Metal Roof Joist Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes joist, joists, spacing, deck, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.43.00 | Slotted Channel Framing | Slotted Channel Framing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes channel, fastening, framing, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.44.00 | Cold-Formed Metal Trusses | Cold-Formed Metal Trusses addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes truss, bracing, bearing, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.44.13 | Cold-Formed Metal Roof Trusses | Cold-Formed Metal Roof Trusses addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes truss, bearing, specified, roof, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.45.00 | Metal Support Assemblies | Metal Support Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes support, fastening, anchors, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.45.13 | Mechanical Metal Supports | Mechanical Metal Supports addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes support, fastening, mechanical, supports, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.45.16 | Electrical Metal Supports | Electrical Metal Supports addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes supports, electrical, coatings, approved, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.45.19 | Communications Metal Supports | Communications Metal Supports addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, supports, support, communications, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.45.23 | Healthcare Metal Supports | Healthcare Metal Supports addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes support, required, specified, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.50.00 | Metal Fabrications | Metal Fabrications addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, fabrications, fastening, metal, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.00 | Metal Stairs | Metal Stairs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, fastening, not, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.13 | Metal Pan Stairs | Metal Pan Stairs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, minimum, stair, flight, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.16 | Metal Floor Plate Stairs | Metal Floor Plate Stairs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, stair, plates, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.17 | Alternating Tread Stairs | Alternating Tread Stairs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tread, stair, specified, depth, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.19 | Metal Grating Stairs | Metal Grating Stairs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes grating, stair, bearing, thickness, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.23 | Metal Fire Escapes | Metal Fire Escapes addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes minimum, after, not, inches, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.33 | Metal Ladders | Metal Ladders addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes ladder, full, rails, rung, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.33.13 | Vertical Metal Ladders | Vertical Metal Ladders addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes ladder, fastening, minimum, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.33.16 | Inclined Metal Ladders | Inclined Metal Ladders addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes ladder, inches, minimum, rung, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.33.23 | Alternating Tread Ladders | Alternating Tread Ladders addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes ladder, tread, minimum, inches, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.36 | Metal Walkways | Metal Walkways addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes walkway, all, free, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.36.13 | Metal Catwalks | Metal Catwalks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, catwalk, specified, thickness, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.36.16 | Metal Ramps | Metal Ramps addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, ramp, fastening, surface, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.51.36.19 | Metal Platforms | Metal Platforms addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes platform, specified, fastening, required, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.52.00 | Metal Railings | Metal Railings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes railing, fastening, specified, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.52.13 | Pipe and Tube Railings | Pipe and Tube Railings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, specified, diameter, rail, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.53.00 | Metal Gratings | Metal Gratings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes grating, bars, panel, bearing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.53.13 | Bar Gratings | Bar Gratings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes bearing, bar, testing, not, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.53.16 | Plank Gratings | Plank Gratings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes panel, bearing, not, coatings, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.53.19 | Expanded Metal Gratings | Expanded Metal Gratings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes grating, panels, edges, coatings, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.54.00 | Metal Floor Plates | Metal Floor Plates addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes plate, inch, minimum, thickness, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.55.00 | Metal Stair Treads and Nosings | Metal Stair Treads and Nosings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes treads, tread, weld, width, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.55.13 | Metal Stair Treads | Metal Stair Treads addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tread, welds, treads, stair, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.55.16 | Metal Stair Nosings | Metal Stair Nosings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes nosing, tread, adjacent, metal, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.56.00 | Metal Castings | Metal Castings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes castings, casting, surfaces, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.58.00 | Formed Metal Fabrications | Formed Metal Fabrications addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes formedmetal, coatings, formed, joints, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.58.13 | Column Covers | Column Covers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, column, joints, cover, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.58.16 | Formed Metal Enclosures | Formed Metal Enclosures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes metal, enclosure, formed, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.58.19 | Heating/Cooling Unit Covers | Heating/Cooling Unit Covers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes cover, specified, minimum, service, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.58.23 | Formed Metal Guards | Formed Metal Guards addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes safety, specified, gauge, coatings, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.59.00 | Metal Specialties | Metal Specialties addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes prevent, specified, shop, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.59.13 | Metal Balconies | Metal Balconies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes balcony, specified, testing, steel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.59.63 | Detention Enclosures | Detention Enclosures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, all, enclosure, steel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.70.00 | Decorative Metal | Decorative Metal addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes decorativemetal, decorative, specified, finish, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.71.00 | Decorative Metal Stairs | Decorative Metal Stairs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes stair, fastening, finish, flight, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.71.13 | Fabricated Metal Spiral Stairs | Fabricated Metal Spiral Stairs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes stair, tread, height, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.73.00 | Decorative Metal Railings | Decorative Metal Railings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, railing, welds, full, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.73.13 | Glazed Decorative Metal Railings | Glazed Decorative Metal Railings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, fastening, specified, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.73.16 | Wire Rope Decorative Metal Railings | Wire Rope Decorative Metal Railings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, stainless, steel, wire, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.74.00 | Decorative Metal Castings | Decorative Metal Castings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes castings, specified, coatings, shop, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.75.00 | Decorative Formed Metal | Decorative Formed Metal addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, approved, coatings, edges, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.76.00 | Decorative Forged Metal | Decorative Forged Metal addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes forged, fastening, assemblies, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 05.77.00 | Decorative Extruded Metal | Decorative Extruded Metal addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, extrusions, extruded, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
MasterSpec® and MasterFormat® are registered trademarks. This blog references section numbers and titles for clarity only and does not reproduce proprietary content. Copyright FTQ360.

QC Hydraulic Cement Underlayment Checklist – Section 03.54.16
Section 03.54.16 covers hydraulic-cement-based underlayments used to level, patch, or resurface floors prior to…

QC Gypsum Cement Underlayment Checklist – Section 03.54.13
Section 03.54.13 covers gypsum cement underlayments used for leveling, sound control, and substrate preparation…

QC Concrete Topping Checklist – Section 03.53.00
Section 03.53.00 covers bonded and unbonded concrete toppings used to improve flatness, restore level, or provide….