Menu Close
- CONSTRUCTION
- HOMEBUILDER
- ENERGY
- MORE
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
- SAFETY APP
- CONSTRUCTION
- HOMEBUILDER
- ENERGY
- MORE
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
- SAFETY APP
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
The Division 08 checklist index brings every existing conditions checklist into one place. Use this index to navigate the full list of existing conditions checklists available on the FTQ360 inspection and QAQC platform.
| Spec Section | Title | Description |
|---|---|---|
| 08.00.00 | Openings | Openings describing equipment, materials, and methods necessary to provide a complete, code-compliant installation integrated with adjacent systems. Activities coordinated with other trades and verified prior to acceptance. |
| 08.01.00 | Operation and Maintenance of Openings | Operation and Maintenance of Openings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes free, door, doors, hardware, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.10 | Operation and Maintenance of Doors and Frames | Operation and Maintenance of Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, latch, fastening, free, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.11 | Operation and Maintenance of Metal Doors and Frames | Operation and Maintenance of Metal Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, firerated, frame, not, with field verification confirming compliance with performance, safety, and quality standards. |
| 08.01.14 | Operation and Maintenance of Wood Doors | Operation and Maintenance of Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, bottom, hardware, latch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.15 | Operation and Maintenance of Plastic Doors | Operation and Maintenance of Plastic Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, plastic, free, hardware, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.16 | Operation and Maintenance of Composite Doors | Operation and Maintenance of Composite Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, composite, hardware, leaf, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.17 | Operation and Maintenance of Integrated Door Opening Assemblies | Operation and Maintenance of Integrated Door Opening Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, operator, testing, hardware, with field verification confirming compliance with performance, safety, and quality standards. |
| 08.01.30 | Operation and Maintenance of Specialty Doors and Frames | Operation and Maintenance of Specialty Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes doors, specialty, coatings, door, with field verification confirming compliance with performance, safety, and quality standards. |
| 08.01.32 | Operation and Maintenance of Sliding Glass Doors | Operation and Maintenance of Sliding Glass Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, glass, track, excessive, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.33 | Operation and Maintenance of Coiling Doors and Grilles | Operation and Maintenance of Coiling Doors and Grilles addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, curtain, fasteners, motor, with field verification confirming compliance with performance, safety, and quality standards. |
| 08.01.34 | Operation and Maintenance of Special Function Doors | Operation and Maintenance of Special Function Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, specialfunction, full, each, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.35 | Operation and Maintenance of Folding Doors and Grilles | Operation and Maintenance of Folding Doors and Grilles addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, travel, obstruction, free, with field verification confirming compliance with performance, safety, and quality standards. |
| 08.01.36 | Operation and Maintenance of Panel Doors | Operation and Maintenance of Panel Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, intact, closes, smoothly, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.39 | Operation and Maintenance of Traffic Doors | Operation and Maintenance of Traffic Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, present, fastening, panels, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.40 | Operation and Maintenance of Entrances | Operation and Maintenance of Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes replaced, curtain, wall, coatings, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.41 | Operation and Maintenance of Entrances | Operation and Maintenance of Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, entrance, doors, hardware, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.42 | Operation and Maintenance of Storefronts | Operation and Maintenance of Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes replaced, storefront, perimeter, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.44 | Operation and Maintenance of Curtain Walls | Operation and Maintenance of Curtain Walls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, continuous, testing, curtain, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.50 | Operation and Maintenance of Windows | Operation and Maintenance of Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes replaced, frame, glazing, free, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.51 | Operation and Maintenance of Metal Windows | Operation and Maintenance of Metal Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes sash, metal, fasteners, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.52 | Operation and Maintenance of Wood Windows | Operation and Maintenance of Wood Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, window, sash, wood, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.52.61 | Wood Window Repairs | Wood Window Repairs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes wood, repaired, surfaces, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.52.71 | Wood Window Rehabilitation | Wood Window Rehabilitation addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes sash, original, wood, type, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.52.81 | Wood Window Replacement | Wood Window Replacement addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, window, inch, perimeter, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.52.91 | Wood Window Restoration | Wood Window Restoration addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes sash, coatings, inch, wood, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.52.93 | Historic Treatment of Wood Windows | Historic Treatment of Wood Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes historic, wood, coatings, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.53 | Operation and Maintenance of Plastic Windows | Operation and Maintenance of Plastic Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes than, glazing, sash, lbf, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.54 | Operation and Maintenance of Composite Windows | Operation and Maintenance of Composite Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes composite, window, exhibit, water, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.56 | Operation and Maintenance of Special Function Windows | Operation and Maintenance of Special Function Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glazing, frame, fastening, seconds, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.60 | Operation and Maintenance of Skylights and Roof Windows | Operation and Maintenance of Skylights and Roof Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, free, around, interior, with field verification confirming compliance with performance, safety, and quality standards. |
| 08.01.61 | Operation and Maintenance of Roof Windows | Operation and Maintenance of Roof Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes roof, window, coatings, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.62 | Operation and Maintenance of Unit Skylights | Operation and Maintenance of Unit Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, glazing, continuous, dewatering, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.63 | Operation and Maintenance of Metal- Framed Skylights | Operation and Maintenance of Metal-Framed Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, frame, continuous, sealant, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.64 | Operation and Maintenance of Plastic Framed Skylights | Operation and Maintenance of Plastic-Framed Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, dewatering, roof, structural, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.70 | Operation and Maintenance of Hardware | Operation and Maintenance of Hardware addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, fastening, hardware, latch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.71 | Operation and Maintenance of Door Hardware | Operation and Maintenance of Door Hardware addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, hardware, latch, power, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.74 | Operation and Maintenance of Access Control Hardware | Operation and Maintenance of Access Control Hardware addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes access, controls, specified, door, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 08.01.75 | Operation and Maintenance of Window Hardware | Operation and Maintenance of Window Hardware addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes window, hardware, testing, sash, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.80 | Maintenance of Glazing | Maintenance of Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glazing, glass, safety, maintenance, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.81 | Maintenance of Glass Glazing | Maintenance of Glass Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, testing, edge, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.84 | Maintenance of Plastic Glazing | Maintenance of Plastic Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes panels, plastic, glazing, panel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.88 | Maintenance of Special Function Glazing | Maintenance of Special Function Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glazing, coatings, testing, units, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.90 | Operation and Maintenance of Louvers and Vents | Operation and Maintenance of Louvers and Vents addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes louvers, louver, free, coatings, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.91 | Operation and Maintenance of Louvers | Operation and Maintenance of Louvers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes louver, louvers, coatings, water, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.92 | Operation and Maintenance of Louvered Equipment Enclosures | Operation and Maintenance of Louvered Equipment Enclosures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes free, louver, coatings, prevent, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.01.95 | Operation and Maintenance of Vents | Operation and Maintenance of Vents addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vent, assemblies, specified, prevent, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.00 | Conservation Treatment for Period Openings | Conservation Treatment for Period Openings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes historic, openings, original, period, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.11 | Conservation Treatment for Period Metal Doors and Frames | Conservation Treatment for Period Metal Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, hardware, surface, inch, with field verification confirming compliance with performance, safety, and quality standards. |
| 08.03.11.23 | Conservation Treatment for Period Bronze Doors and Frames | Conservation Treatment for Period Bronze Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes bronze, original, coatings, metal, with field verification confirming compliance with performance, safety, and quality standards. |
| 08.03.14 | Conservation Treatment for Period Wood Doors | Conservation Treatment for Period Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, coatings, inserts, structural, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.14.23 | Conservation Treatment for Period Metal-Faced Wood Doors | Conservation Treatment for Period Metal-Faced Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes metal, original, face, door, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.14.33 | Conservation Treatment for Period Stile and Rail Wood Doors | Conservation Treatment for Period Stile and Rail Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes original, inch, wood, door, with field verification confirming compliance with performance, safety, and quality standards. |
| 08.03.30 | Conservation Treatment for Period Specialty Doors and Frames | Conservation Treatment for Period Specialty Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes finish, original, door, coatings, with field verification confirming compliance with performance, safety, and quality standards. |
| 08.03.34 | Conservation Treatment for Period Special Function Doors | Conservation Treatment for Period Special Function Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, original, existing, treatment, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.34.59 | Conservation Treatment for Period Vault Doors | Conservation Treatment for Period Vault Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, door, removed, metal, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.50 | Conservation Treatment for Period Windows | Conservation Treatment for Period Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes sash, inch, glass, wood, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.51 | Conservation Treatment for Period Metal Windows | Conservation Treatment for Period Metal Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes original, thickness, coatings, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.51.16 | Conservation Treatment for Period Bronze Windows | Conservation Treatment for Period Bronze Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes bronze, continuous, nonferrous, coatings, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.51.23 | Conservation Treatment for Period Steel Windows | Conservation Treatment for Period Steel Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, frame, steel, original, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.52 | Conservation Treatment for Period Wood Windows | Conservation Treatment for Period Wood Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes historic, sash, original, glass, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.70 | Conservation Treatment for Period Hardware | Conservation Treatment for Period Hardware addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes hardware, original, approved, coatings, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.71 | Conservation Treatment for Period Door Hardware | Conservation Treatment for Period Door Hardware addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes hardware, coatings, metal, cleaning, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.75 | Conservation Treatment for Period Window Hardware | Conservation Treatment for Period Window Hardware addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes hardware, removal, removed, treatment, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.90 | Conservation Treatment for Period Louvers and Vents | Conservation Treatment for Period Louvers and Vents addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, louvers, vents, historic, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.91 | Conservation Treatment for Period Louvers | Conservation Treatment for Period Louvers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes metal, louver, approved, wall, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.03.95 | Conservation Treatment for Period Vents | Conservation Treatment for Period Vents addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vent, original, historic, metal, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.05.00 | Common Work Results for Openings | Common Work Results for Openings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes opening, fastening, free, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.05.05 | Selective Demolition for Openings | Selective Demolition for Openings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes demolition, openings, remain, before, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.06.00 | Schedules for Openings | Schedules for Openings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, opening, hardware, glazing, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 08.06.10 | Door Schedule | Door Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, scheduling, doors, hardware, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.06.10.13 | Door Type Schedule | Door Type Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, type, scheduling, scheduled, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 08.06.10.16 | Frame Type Schedule | Frame Type Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, scheduling, frames, opening, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 08.06.40 | Schedules for Entrances | Schedules for Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, testing, entrance, type, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 08.06.41 | Entrance Schedule | Entrance Schedule coordinating delivery, installation sequencing, testing, and outage planning to align with project requirements. Activities coordinated with other trades and verified prior to acceptance. |
| 08.06.42 | Storefront Schedule | Storefront Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, storefront, each, testing, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.06.50 | Window Schedule | Window Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes window, scheduling, windows, each, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.06.60 | Skylight Schedule | Skylight Schedule coordinating delivery, installation sequencing, testing, and outage planning to align with project requirements. Activities coordinated with other trades and verified prior to acceptance. |
| 08.06.70 | Hardware Schedule | Hardware Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes hardware, scheduling, door, frame, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.06.71 | Door Hardware Schedule | Door Hardware Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes hardware, scheduling, door, scheduled, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 08.06.80 | Glazing Schedule | Glazing Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, glazing, glass, each, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.06.90 | Louver and Vent Schedule | Louver and Vent Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, scheduled, louvers, approved, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 08.08.00 | Commissioning of Openings | Commissioning of Openings addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, testing, lbf, field, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.10.00 | Doors and Frames | Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, firerated, correspond, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.00 | Metal Doors and Frames | Metal Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, frame, door, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.13 | Hollow Metal Doors and Frames | Hollow Metal Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, inch, rating, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.13.13 | Standard Hollow Metal Doors and Frames | Standard Hollow Metal Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, inch, door, required, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.13.16 | Custom Hollow Metal Doors and Frames | Custom Hollow Metal Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frames, inch, door, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.16 | Aluminum Doors and Frames | Aluminum Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, door, aluminum, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.19 | Stainless-Steel Doors and Frames | Stainless-Steel Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, door, frames, required, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.23 | Bronze Doors and Frames | Bronze Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes bronze, frames, frame, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.63 | Metal Screen and Storm Doors and Frames | Metal Screen and Storm Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, continuous, fastening, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.63.13 | Steel Screen and Storm Doors and Frames | Steel Screen and Storm Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, coatings, continuous, full, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.63.23 | Aluminum Screen and Storm Doors and Frames | Aluminum Screen and Storm Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, aluminum, frame, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.66 | Metal Screen Doors and Frames | Metal Screen Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, minimum, door, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.66.13 | Steel Screen Doors and Frames | Steel Screen Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, inch, screen, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.66.23 | Aluminum Screen Doors and Frames | Aluminum Screen Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, aluminum, door, than, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.69 | Metal Storm Doors and Frames | Metal Storm Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, specified, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.69.13 | Steel Storm Doors and Frames | Steel Storm Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, specified, frame, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.69.23 | Aluminum Storm Doors and Frames | Aluminum Storm Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, continuous, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.73 | Sliding Metal Fire Doors | Sliding Metal Fire Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, manufacturer’s, panels, guides, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.11.74 | Sliding Metal Grilles | Sliding Metal Grilles addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes grille, track, full, travel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.12.00 | Metal Frames | Metal Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, jamb, inch, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.12.13 | Hollow Metal Frames | Hollow Metal Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frames, frame, specified, after, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.12.13.13 | Standard Hollow Metal Frames | Standard Hollow Metal Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, inch, door, jamb, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.12.13.53 | Custom Hollow Metal Frames | Custom Hollow Metal Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, frames, jamb, fully, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.12.16 | Aluminum Frames | Aluminum Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, inch, aluminum, feet, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.12.19 | Stainless-Steel Frames | Stainless-Steel Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, stainlesssteel, specified, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.12.23 | Bronze Frames | Bronze Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, bronze, height, alignment, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.13.00 | Metal Doors | Metal Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, not, full, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.13.13 | Hollow Metal Doors | Hollow Metal Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, edge, required, hardware, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.13.13.13 | Standard Hollow Metal Doors | Standard Hollow Metal Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, minimum, anchors, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.13.13.53 | Custom Hollow Metal Doors | Custom Hollow Metal Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, continuous, finish, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.13.16 | Aluminum Doors | Aluminum Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, minimum, aluminum, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.13.16.13 | Aluminum Terrace Doors | Aluminum Terrace Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, continuous, door, jambs, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.13.19 | Stainless-Steel Doors | Stainless-Steel Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, gauge, edge, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.13.23 | Bronze Doors | Bronze Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, bronze, frame, type, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.13.73 | Sliding Metal Doors | Sliding Metal Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, track, floor, electrical, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.13.76 | Bifolding Metal Doors | Bifolding Metal Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, manufacturer, fastening, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.00 | Wood Doors | Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, hardware, doors, edge, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.13 | Carved Wood Doors | Carved Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, carved, wood, edges, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.16 | Flush Wood Doors | Flush Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, inch, than, core, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.23 | Clad Wood Doors | Clad Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, wood, doors, edges, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.23.13 | Metal-Faced Wood Doors | Metal-Faced Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, metal, edge, rated, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.23.16 | Plastic-Laminate- Faced Wood Doors | Plastic-Laminate-Faced Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, core, faces, laminate, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.23.17 | Plastic-Faced Wood Doors | Plastic-Faced Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, edges, hinge, edge, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.23.19 | Molded-Hardboard- Faced Wood Doors | Molded-Hardboard-Faced Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, hardware, firerated, doors, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.29 | Prefinished Wood Doors | Prefinished Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, finish, field, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.33 | Stile and Rail Wood Doors | Stile and Rail Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, not, doors, edges, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.33.13 | Wood Terrace Doors | Wood Terrace Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, between, head, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.66 | Wood Screen Doors | Wood Screen Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, door, specified, wood, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.69 | Wood Storm Doors | Wood Storm Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, wood, screws, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.73 | Sliding Wood Doors | Sliding Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, inch, track, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.14.76 | Bifolding Wood Doors | Bifolding Wood Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, panel, alignment, hanging, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.15.00 | Plastic Doors | Plastic Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, hardware, plastic, approved, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.15.13 | Laminated Plastic Doors | Laminated Plastic Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, edge, required, core, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.15.16 | Solid Plastic Doors | Solid Plastic Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, inch, manufacturer, leaves, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.15.66 | Plastic Screen Doors | Plastic Screen Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, screen, frame, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.15.69 | Plastic Storm Doors | Plastic Storm Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, fasteners, frame, head, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.15.73 | Sliding Plastic Doors | Sliding Plastic Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, inch, inches, panels, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.15.76 | Bifolding Plastic Doors | Bifolding Plastic Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, track, panels, height, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.16.00 | Composite Doors | Composite Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, composite, continuous, any, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.16.13 | Fiberglass Doors | Fiberglass Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, alignment, hardware, fasteners, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.16.73 | Sliding Composite Doors | Sliding Composite Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, inch, track, full, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.16.76 | Bifolding Composite Doors | Bifolding Composite Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes full, door, alignment, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.17.00 | Integrated Door Opening Assemblies | Integrated Door Opening Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, hardware, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.17.13 | Integrated Metal Door Opening Assemblies | Integrated Metal Door Opening Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, assembly, rating, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.17.23 | Integrated Wood Door Opening Assemblies | Integrated Wood Door Opening Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, leaf, frame, hardware, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.17.33 | Integrated Plastic Door Opening Assemblies | Integrated Plastic Door Opening Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, plastic, latch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.17.43 | Integrated Composite Door Opening Assemblies | Integrated Composite Door Opening Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, composite, hardware, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.30.00 | Specialty Doors and Frames | Specialty Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, inch, edge, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.31.00 | Access Doors and Panels | Access Doors and Panels addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes access, door, panel, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.31.13 | Access Doors and Frames | Access Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, doors, door, access, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.31.13.53 | Security Access Doors and Frames | Security Access Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, door, frame, fully, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.31.16 | Access Panels and Frames | Access Panels and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes panel, access, frame, panels, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.32.00 | Sliding Glass Doors | Sliding Glass Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, manufacturer, inch, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.32.13 | Sliding Aluminum- Framed Glass Doors | Sliding Aluminum-Framed Glass Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, continuous, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.32.16 | Sliding Plastic-Framed Glass Doors | Sliding Plastic-Framed Glass Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, fasteners, full, sill, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.32.19 | Sliding Wood-Framed Glass Doors | Sliding Wood-Framed Glass Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, door, full, than, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.33.00 | Coiling Doors and Grilles | Coiling Doors and Grilles addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, inch, fastening, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.33.13 | Coiling Counter Doors | Coiling Counter Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes curtain, fully, fastening, fasteners, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.33.16 | Coiling Counter Grilles | Coiling Counter Grilles addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes curtain, approved, documentation, alignment, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. |
| 08.33.23 | Overhead Coiling Doors | Overhead Coiling Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, inch, curtain, door, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.33.23.13 | Overhead Rapid Coiling Doors | Overhead Rapid Coiling Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, curtain, inch, speed, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.33.26 | Overhead Coiling Grilles | Overhead Coiling Grilles addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, alignment, grille, electrical, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.33.33 | Side Coiling Doors | Side Coiling Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, inch, curtain, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.33.36 | Side Coiling Grilles | Side Coiling Grilles addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes curtain, full, track, floor, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. |
| 08.33.43 | Overhead Coiling Smoke Curtains | Overhead Coiling Smoke Curtains addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes curtain, manufacturer, testing, deployment, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.33.44 | Overhead Coiling Fire Curtains | Overhead Coiling Fire Curtains addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes curtain, visible, height, side, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.00 | Special Function Doors | Special Function Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, inch, manufacturer, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.13 | Cold Storage Doors | Cold Storage Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, thermal, insulated, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.16 | Hangar Doors | Hangar Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, inch, floor, safety, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.19 | Industrial Doors | Industrial Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, testing, operator, fully, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.33 | Lightproof Doors | Lightproof Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes light, door, dewatering, lightproof, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.36 | Darkroom Doors | Darkroom Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, specified, dewatering, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.46 | Radio-Frequency- Interference Shielding Doors | Radio-Frequency-Interference Shielding Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, conductive, frame, perimeter, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.49 | Radiation Shielding Doors and Frames | Radiation Shielding Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes lead, door, shielding, radiation, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.49.13 | Neutron Shielding Doors and Frames | Neutron Shielding Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes shielding, door, frame, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.53 | Security Doors and Frames | Security Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, security, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.56 | Security Gates | Security Gates addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes gate, specified, electrical, documentation, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.58 | File Room Doors and Frames | File Room Doors and Frames addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, rating, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.59 | Vault Doors and Day Gates | Vault Doors and Day Gates addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, fastening, vault, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.73 | Sound Control Door Assemblies | Sound Control Door Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, acoustic, continuous, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.73.13 | Metal Sound Control Door Assemblies | Metal Sound Control Door Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes acoustic, door, specified, rating, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.34.73.16 | Wood Sound Control Door Assemblies | Wood Sound Control Door Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, acoustic, dewatering, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.35.00 | Folding Doors and Grilles | Folding Doors and Grilles addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes folding, door, required, binding, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.35.13 | Folding Doors | Folding Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, track, testing, required, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.35.13.13 | Accordion Folding Doors | Accordion Folding Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, track, inch, required, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.35.13.23 | Accordion Folding Fire Doors | Accordion Folding Fire Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, minimum, alignment, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.35.13.33 | Panel Folding Doors | Panel Folding Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, inch, bottom, track, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.35.16 | Folding Grilles | Folding Grilles addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes grille, curtain, inch, track, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.35.16.13 | Accordion Folding Grilles | Accordion Folding Grilles addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes grille, inch, fasteners, track, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.36.00 | Panel Doors | Panel Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, assemblies, manufacturer, inches, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.36.13 | Sectional Doors | Sectional Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, full, panel, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.36.16 | Single-Panel Doors | Single-Panel Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, full, panel, documentation, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.36.19 | Multi-Leaf Vertical Lift Doors | Multi-Leaf Vertical Lift Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, inch, motor, floor, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.36.23 | Telescoping Vertical Lift Doors | Telescoping Vertical Lift Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, manufacturer, electrical, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.38.00 | Traffic Doors | Traffic Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, floor, door, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.38.13 | Flexible Strip Doors | Flexible Strip Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes strips, strip, full, width, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.38.16 | Flexible Traffic Doors | Flexible Traffic Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, panel, floor, inches, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.38.19 | Rigid Traffic Doors | Rigid Traffic Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, anchors, panel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.39.00 | Pressure-Resistant Doors | Pressure-Resistant Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, door, frame, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.39.13 | Airtight Doors | Airtight Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, compression, continuous, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.39.19 | Watertight Doors | Watertight Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, frame, specified, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.39.53 | Blast-Resistant Doors | Blast-Resistant Doors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, blast, specified, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.40.00 | Entrances | Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glazing, joints, fully, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.41.00 | Entrances and Storefronts | Entrances and Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes storefront, specified, framing, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.41.13 | Aluminum-Framed Entrances and Storefronts | Aluminum-Framed Entrances and Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, inch, glazing, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.41.13.13 | Fire-Rated Aluminum- Framed Entrances and Storefronts | Fire-Rated Aluminum-Framed Entrances and Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes listed, glazing, labels, rating, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.41.16 | Bronze-Framed Entrances and Storefronts | Bronze-Framed Entrances and Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes bronze, specified, inch, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.41.19 | Stainless-Steel-Framed Entrances and Storefronts | Stainless-Steel-Framed Entrances and Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, stainless, glazing, entrance, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.41.23 | Steel-Framed Entrances and Storefronts | Steel-Framed Entrances and Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes members, fastening, frame, steel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.41.26 | All-Glass Entrances and Storefronts | All-Glass Entrances and Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, door, panels, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.41.26.13 | Point Supported All- Glass Storefronts | Point Supported All-Glass Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, specified, fastening, steel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.42.00 | Entrances | Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, frame, door, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.42.13 | Aluminum-Framed Entrances | Aluminum-Framed Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, inch, door, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.42.26 | All-Glass Entrances | All-Glass Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, floor, panel, hardware, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.42.29 | Automatic Entrances | Automatic Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, operator, opening, safety, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.42.29.13 | Folding Automatic Entrances | Folding Automatic Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, opening, minimum, safety, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.42.29.23 | Sliding Automatic Entrances | Sliding Automatic Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, specified, testing, operator, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 08.42.29.33 | Swinging Automatic Entrances | Swinging Automatic Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, safety, testing, not, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.42.33 | Revolving Door Entrances | Revolving Door Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, rotation, inch, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.42.33.13 | Security Revolving Door Entrances | Security Revolving Door Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, fastening, rotation, alarm, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.42.36 | Balanced Door Entrances | Balanced Door Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, door, frame, over, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.42.39 | Pressure-Resistant Entrances | Pressure-Resistant Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, specified, frame, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.42.43 | Intensive Care Unit/Critical Care Unit Entrances | Intensive Care Unit/Critical Care Unit Entrances addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, testing, specified, width, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.43.00 | Storefronts | Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes storefront, framing, glazing, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.43.11 | Timber-Framed Storefronts | Timber-Framed Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes timber, frame, members, flashing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.43.13 | Aluminum-Framed Storefronts | Aluminum-Framed Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, specified, each, storefront, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.43.13.13 | Fire-Rated Aluminum Storefronts | Fire-Rated Aluminum Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes framing, firerated, listing, storefront, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.43.16 | Bronze-Framed Storefronts | Bronze-Framed Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes bronze, inch, framing, inches, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.43.19 | Stainless-Steel-Framed Storefronts | Stainless-Steel-Framed Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, stainlesssteel, inches, framing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.43.23 | Steel-Framed Storefronts | Steel-Framed Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, fastening, minimum, frames, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.43.26 | All-Glass Storefronts | All-Glass Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, panel, specified, alignment, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.43.27 | Channel Glass Storefronts | Channel Glass Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, testing, panels, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.43.29 | Sliding Storefronts | Sliding Storefronts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, sliding, full, sealant, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.00 | Curtain Wall and Glazed Assemblies | Curtain Wall and Glazed Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes sealant, specified, framing, type, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.11 | Glazed Timber Curtain Walls | Glazed Timber Curtain Walls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, timber, wall, members, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.12 | Glazed Composite Curtain Wall | Glazed Composite Curtain Wall addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glazing, curtain, wall, framing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.12.13 | Glazed Fiberglass Curtain Wall | Glazed Fiberglass Curtain Wall addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes structural, glazing, testing, framing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.13 | Glazed Aluminum Curtain Walls | Glazed Aluminum Curtain Walls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, continuous, testing, width, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.16 | Glazed Bronze Curtain Walls | Glazed Bronze Curtain Walls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, bronze, specified, exterior, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.18 | Glazed Steel Curtain Walls | Glazed Steel Curtain Walls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, specified, continuous, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.19 | Glazed Stainless-Steel Curtain Walls | Glazed Stainless-Steel Curtain Walls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes minimum, curtain, wall, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.23 | Structural Sealant Glazed Curtain Walls | Structural Sealant Glazed Curtain Walls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes silicone, structural, glass, bead, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.26 | Structural Glass Curtain Walls | Structural Glass Curtain Walls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, fastening, testing, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.26.13 | Glass Framed Point Supported Glass Curtain Walls | Glass Framed Point Supported Glass Curtain Walls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, hardware, specified, fully, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.26.16 | Metal Framed Point Supported Glass Curtain Walls | Metal Framed Point Supported Glass Curtain Walls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, fastening, hardware, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.26.23 | Cable Framed Point Supported Glass Curtain Walls | Cable Framed Point Supported Glass Curtain Walls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, fastening, specified, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.44.33 | Sloped Glazing Assemblies | Sloped Glazing Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glazing, fastening, specified, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.45.00 | Translucent Wall and Roof Assemblies | Translucent Wall and Roof Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes panel, fastener, manufacturer’s, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.45.13 | Structured- Polycarbonate-Panel Assemblies | Structured-Polycarbonate-Panel Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes panel, framing, joints, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.45.23 | Fiberglass-Sandwich- Panel Assemblies | Fiberglass-Sandwich-Panel Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes panel, fastening, testing, joints, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.46.00 | Window Wall Assemblies | Window Wall Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, manufacturer’s, framing, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.50.00 | Windows | Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes window, inches, minimum, sealant, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.51.00 | Metal Windows | Metal Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, window, testing, perimeter, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.51.13 | Aluminum Windows | Aluminum Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes window, frame, glass, sealant, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.51.16 | Bronze Windows | Bronze Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes bronze, specified, minimum, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.51.19 | Stainless-Steel Windows | Stainless-Steel Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes window, frame, stainless, stainlesssteel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.51.23 | Steel Windows | Steel Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes minimum, glazing, coatings, steel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.51.23.13 | Hot-Rolled Steel Windows | Hot-Rolled Steel Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frames, glass, glazing, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.51.23.23 | Cold-Rolled Steel Windows | Cold-Rolled Steel Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, sealant, full, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.51.66 | Metal Window Screens | Metal Window Screens addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes screen, frame, mesh, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.51.69 | Metal Storm Windows | Metal Storm Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, stormwindow, minimum, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.52.00 | Wood Windows | Wood Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, exterior, window, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.52.13 | Metal-Clad Wood Windows | Metal-Clad Wood Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, metal, testing, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.52.16 | Plastic-Clad Wood Windows | Plastic-Clad Wood Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, window, type, jamb, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.52.66 | Wood Window Screens | Wood Window Screens addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes screen, frame, inch, wood, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.52.69 | Wood Storm Windows | Wood Storm Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes wood, specified, glazing, unit, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.53.00 | Plastic Windows | Plastic Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, continuous, flashing, window, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.53.13 | Vinyl Windows | Vinyl Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, flashing, jambs, vinyl, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.53.66 | Vinyl Window Screens | Vinyl Window Screens addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, screen, window, vinyl, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.53.69 | Vinyl Storm Windows | Vinyl Storm Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes continuous, vinyl, window, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.54.00 | Composite Windows | Composite Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, composite, window, units, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.54.13 | Fiberglass Windows | Fiberglass Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fiberglass, window, fasteners, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.54.66 | Fiberglass Window Screens | Fiberglass Window Screens addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes screen, frame, window, mesh, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.54.69 | Fiberglass Storm Windows | Fiberglass Storm Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fiberglass, sealant, manufacturer, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.55.00 | Pressure-Resistant Windows | Pressure-Resistant Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, frame, manufacturer, depth, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.55.13 | Tornado-Resistant Windows | Tornado-Resistant Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, testing, specified, structural, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.55.23 | Blast-Resistant Windows | Blast-Resistant Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes blast, specified, glazing, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.56.00 | Special Function Windows | Special Function Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glazing, testing, sealant, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.56.19 | Pass Windows | Pass Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, window, specified, gaskets, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.56.46 | Radio-Frequency- Interference Shielding Windows | Radio-Frequency-Interference Shielding Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes conductive, specified, window, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.56.49 | Radiation Shielding Windows | Radiation Shielding Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes lead, glass, frame, radiation, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.56.53 | Security Windows | Security Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes security, glazing, specified, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.56.56 | Security Window Screens | Security Window Screens addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes screen, minimum, frame, mesh, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.56.59 | Service and Teller Window Units | Service and Teller Window Units addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes window, specified, glazing, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.56.73 | Sound Control Windows | Sound Control Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes acoustic, window, specified, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.56.88 | Interior Insulating Windows | Interior Insulating Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inches, window, inch, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.60.00 | Roof Windows and Skylights | Roof Windows and Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, curb, roof, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.61.00 | Roof Windows | Roof Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes roof, frame, specified, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.61.13 | Metal Roof Windows | Metal Roof Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes frame, flashing, minimum, water, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.61.16 | Wood Roof Windows | Wood Roof Windows addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes roof, window, inches, wood, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.62.00 | Unit Skylights | Unit Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, curb, roof, required, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.62.13 | Domed Unit Skylights | Domed Unit Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, roof, inch, all, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.62.16 | Pyramidal Unit Skylights | Pyramidal Unit Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, curb, inches, fasteners, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.62.19 | Vaulted Unit Skylights | Vaulted Unit Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, curb, after, framing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.62.23 | Tubular Skylights | Tubular Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes roof, skylight, curb, tube, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.63.00 | Metal-Framed Skylights | Metal-Framed Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, testing, specified, approved, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.63.13 | Domed Metal-Framed Skylights | Domed Metal-Framed Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, frame, curb, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.63.16 | Pyramidal Metal- Framed Skylights | Pyramidal Metal-Framed Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes framing, inch, skylight, over, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.63.19 | Vaulted Metal-Framed Skylights | Vaulted Metal-Framed Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, specified, minimum, glazing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.63.23 | Ridge Metal-Framed Skylights | Ridge Metal-Framed Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes continuous, skylight, specified, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.63.53 | Motorized Metal- Framed Skylights | Motorized Metal-Framed Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, frame, minimum, curb, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.64.00 | Plastic-Framed Skylights | Plastic-Framed Skylights addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, curb, frame, sealant, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.65.00 | Glazed Canopies | Glazed Canopies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, fastening, specified, panel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.65.13 | Suspended Glazed Canopies | Suspended Glazed Canopies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, edge, specified, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.67.00 | Skylight Protection and Screens | Skylight Protection and Screens addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes skylight, testing, screen, inches, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.70.00 | Hardware | Hardware addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, hardware, specified, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.71.00 | Door Hardware | Door Hardware addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, hardware, latch, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.71.13 | Automatic Door Operators | Automatic Door Operators addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, operator, automatic, power, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.71.53 | Security Door Hardware | Security Door Hardware addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes security, door, fastening, latch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.75.00 | Window Hardware | Window Hardware addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes hardware, window, manufacturer, sash, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.75.13 | Automatic Window Equipment | Automatic Window Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes window, operator, testing, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.75.16 | Window Operators | Window Operators addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes operator, testing, specified, window, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.78.00 | Special Function Hardware | Special Function Hardware addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes hardware, devices, exit, power, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.79.00 | Hardware Accessories | Hardware Accessories addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes door, doors, fasteners, flush, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.79.13 | Key Storage Equipment | Key Storage Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes cabinet, key, minimum, model, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.80.00 | Glazing | Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, glazing, frame, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.81.00 | Glass Glazing | Glass Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, glazing, specified, sealant, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.81.13 | Decorative Glass Glazing | Decorative Glass Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, glazing, decorative, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.81.23 | Exterior Glass Glazing | Exterior Glass Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, glazing, testing, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.81.26 | Interior Glass Glazing | Interior Glass Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, glazing, edge, panel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.83.00 | Mirrors | Mirrors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes mirror, glass, adhesive, panels, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.83.13 | Mirrored Glass Glazing | Mirrored Glass Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes mirror, edge, edges, mirrors, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.83.16 | Mirrored Plastic Glazing | Mirrored Plastic Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glazing, plastic, panel, mirror, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.84.00 | Plastic Glazing | Plastic Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glazing, panel, prevent, plastic, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.84.13 | Decorative Plastic Glazing | Decorative Plastic Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes plastic, glazing, panel, panels, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.85.00 | Glazing Accessories | Glazing Accessories addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, blocks, edge, glazing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.87.00 | Glazing Surface Films | Glazing Surface Films addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes film, approved, adhesive, application, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.87.13 | Solar Control Films | Solar Control Films addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes film, manufacturer, glass, application, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.87.23 | Safety and Security Films | Safety and Security Films addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes film, specified, glass, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.87.23.13 | Safety Films | Safety Films addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes film, glass, manufacturer, sealant, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.87.23.16 | Security Films | Security Films addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes film, structural, edge, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.87.26 | Bird Control Film | Bird Control Film addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes film, pattern, bird, vertical, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.87.33 | Decorative Films | Decorative Films addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes film, manufacturer, glass, application, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.88.00 | Special Function Glazing | Special Function Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glazing, glass, testing, structural, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.88.13 | Fire-Resistant Glazing | Fire-Resistant Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, listed, glazing, rating, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.88.19 | Hurricane-Resistant Glazing | Hurricane-Resistant Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, testing, frame, glazing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.88.23 | Cable Suspended Glazing | Cable Suspended Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, specified, cable, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.88.33 | Transparent Mirrored Glazing | Transparent Mirrored Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, glazing, coatings, lite, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.88.36 | Switchable Glass | Switchable Glass addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, electrical, switchable, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.88.36.16 | Electronically Controlled Switchable Glass | Electronically Controlled Switchable Glass addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes glass, switchable, glazing, electrical, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.88.39 | Pressure-Resistant Glazing | Pressure-Resistant Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, glazing, design, edge, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.88.49 | Radiation-Resistant Glazing | Radiation-Resistant Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes lead, glazing, radiation, shielding, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.88.53 | Security Glazing | Security Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes edges, glazing, manufacturer, glass, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.88.56 | Ballistics-Resistant Glazing | Ballistics-Resistant Glazing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes ballistic, glazing, manufacturer, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.90.00 | Louvers and Vents | Louvers and Vents addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, louver, frame, exterior, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.91.00 | Louvers | Louvers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes louvers, louver, inch, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.91.13 | Motorized Wall Louvers | Motorized Wall Louvers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes electrical, specified, louver, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.91.16 | Operable Wall Louvers | Operable Wall Louvers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes louver, frame, specified, documentation, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. |
| 08.91.19 | Fixed Louvers | Fixed Louvers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes louver, free, area, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.91.26 | Door Louvers | Door Louvers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes louver, door, hardware, rating, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.92.00 | Louvered Equipment Enclosures | Louvered Equipment Enclosures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, inch, minimum, panels, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.95.00 | Vents | Vents addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vent, testing, assemblies, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.95.13 | Soffit Vents | Soffit Vents addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vent, soffit, nfva, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.95.16 | Wall Vents | Wall Vents addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vent, wall, specified, free, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.95.33 | Explosion Vents | Explosion Vents addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes panel, vent, release, relief, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 08.95.43 | Flood Vents | Flood Vents addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vent, area, flood, opening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
MasterSpec® and MasterFormat® are registered trademarks. This blog references section numbers and titles for clarity only and does not reproduce proprietary content. Copyright FTQ360.

QC Hydraulic Cement Underlayment Checklist – Section 03.54.16
Section 03.54.16 covers hydraulic-cement-based underlayments used to level, patch, or resurface floors prior to…

QC Gypsum Cement Underlayment Checklist – Section 03.54.13
Section 03.54.13 covers gypsum cement underlayments used for leveling, sound control, and substrate preparation…

QC Concrete Topping Checklist – Section 03.53.00
Section 03.53.00 covers bonded and unbonded concrete toppings used to improve flatness, restore level, or provide….