Menu Close
- CONSTRUCTION
- HOMEBUILDER
- ENERGY
- MORE
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
- SAFETY APP
- CONSTRUCTION
- HOMEBUILDER
- ENERGY
- MORE
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
- SAFETY APP
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
Division 22 brings together the piping, equipment, fixtures, controls, and supporting components required to distribute water, remove sanitary waste, heat domestic water, and keep plumbing systems accessible, testable, and maintainable. The work may be divided among separate specification sections, but field quality depends on those sections functioning as one coordinated system.
The Division 22 QAQC approach uses a consistent control pattern across the plumbing scope: confirm approved materials and coordinated installation requirements before work starts, verify the first installation before repetition begins, monitor production work before it is concealed, and complete the testing, identification, documentation, and training needed for turnover.
FTQ360 connects those controls through location-based inspections, required evidence, test records, corrective actions, and sign-offs so the completed record shows how the plumbing systems were installed and accepted—not simply that a checklist was completed.
Plumbing work extends from buried and concealed piping to the fixtures and equipment occupants use every day. Facility water distribution piping must maintain the approved material, joining, restraint, corrosion-protection, and cleanliness requirements from the utility connection through the building service. Facility sanitary sewerage depends on correct inverts, continuous slope, sound joints, stable bedding, accessible cleanouts, and properly installed drainage specialties and pumping equipment.
Supporting sections are just as important. Hangers and supports preserve piping alignment, drainage slope, movement allowances, and insulation integrity. General-duty valves must match the service, pressure, temperature, flow direction, and operating function while remaining accessible after insulation and finishes are installed. Heat tracing introduces electrical cables, controls, sensors, terminations, insulation interfaces, and testing requirements that must be coordinated before concealment.
Equipment and fixture sections complete the system. Commercial gas domestic water heaters require coordinated bases, anchorage, gas trains, venting, relief devices, piping connections, controls, service clearances, and functional testing. Commercial plumbing fixtures depend on accurate rough-ins, secure carriers, accessible valves, backflow protection, tempering devices, drainage connections, finish protection, and final flow and leak testing.
The general plumbing specification context also reinforces division-wide responsibilities for equipment accessibility, identification, testing, flushing, disinfection, operational verification, operation and maintenance data, and personnel instruction. These requirements cross individual section boundaries and are most effective when they are planned and documented as part of one plumbing QAQC program.
Across Division 22, many failures begin before installation. Incorrect materials, pressure classes, valve types, heater configurations, fixture models, cable types, or joining systems can enter the work when receiving inspections and submittal checks are treated as paperwork rather than field controls. Once those products are distributed through the project, correction becomes increasingly difficult.
Coordination failures create another recurring pattern. Piping may be installed without adequate support, drainage slope, restraint, insulation clearance, access, or room for equipment removal. Fixture rough-ins may conflict with partitions or accessibility clearances. Valves, cleanouts, controls, and relief devices may be technically installed but blocked by ceilings, cabinets, insulation, or adjacent equipment. Heat tracing can be damaged or rendered ineffective when piping, electrical, and insulation work are not sequenced together.
Concealed work carries particular risk. Buried water and sanitary piping can hide inadequate bedding, restraint, separation, joint defects, or contamination. Above-ceiling systems can conceal unsupported valves, incomplete firestopping, missing identification, damaged insulation, or inaccessible maintenance points. A strong QAQC process establishes pre-cover hold points and requires inspection evidence while the work can still be seen and corrected.
Testing and turnover failures are equally significant. A system that looks complete may still leak, drain poorly, fail disinfection, operate at the wrong temperature, trip electrical protection, or shut down because controls and safeties were never fully tested. Missing tags, incomplete test reports, inaccurate record drawings, and weak O&M documentation can turn otherwise acceptable installations into long-term operational problems.
Division 22 checklists work best as a coordinated sequence rather than separate inspection forms. Water distribution and sanitary sewerage inspections establish routing, elevations, materials, joints, bedding, penetrations, and test boundaries. Hanger and support inspections confirm that those piping systems remain aligned, properly sloped, protected, and structurally supported as work progresses.
Valve inspections then verify that system components are selected for the correct service, installed in the correct direction, independently supported where necessary, and accessible for operation and maintenance. Heat-tracing inspections connect piping acceptance to electrical and insulation work by requiring cable verification, pre-insulation testing, post-insulation retesting, control checks, and identification before energization.
Commercial water-heater inspections bring together domestic-water piping, fuel-gas service, venting, electrical controls, relief protection, anchorage, and startup. Fixture inspections close the occupied-space end of the system by verifying rough-ins, carriers, trim, backflow protection, accessible controls, temperatures, flow, drainage, and finishes.
When these inspections share location references, equipment identifiers, photos, test records, and corrective-action histories in FTQ360, the result is more than a digital version of a paper checklist. The record can show that a buried water line was inspected before backfill, that its valves were tagged and accessible, that the system passed testing and disinfection, that connected equipment was commissioned, and that the final fixtures operated without leaks. That continuity makes the plumbing QAQC record useful during construction, punch, commissioning, turnover, and later investigation.
Use this index to navigate Division 22 plumbing checklists covering piping, supports, valves, heat tracing, water-heating equipment, sanitary systems, and commercial fixtures. Download links provide downloadable checklist examples, while Blog Article links point to detailed articles describing recurring failure modes, field controls, testing, and closeout practices for selected sections.
These checklists cover the concrete operations that carry the most schedule, cost, and quality risk. Each one has both a downloadable sample checklist and a full blog article that walks through common failure modes and QAQC strategies.
Note: “Learn More” appears only for sections with an FTQ360 blog article.
22.05.23
General-Duty Valves for Plumbing Piping
Verifies valve selection, service ratings, flow direction, joining, accessibility, support, insulation clearance, testing, identification, and turnover records.
22.05.29
Hangers and Supports for Plumbing Piping and Equipment
Covers support types, structural attachments, spacing, insulated piping protection, movement allowances, concentrated loads, equipment supports, roof conditions, and coating repairs.
22.05.33
Heat Tracing for Plumbing Piping
Coordinates cable selection, routing, terminations, sensors, controls, insulation interfaces, warning identification, electrical testing, energization, and commissioning.
22.11.13
Facility Water Distribution Piping
Addresses approved pipe materials, utility connections, joining, burial, thrust restraint, valves and specialties, cleanliness, pressure testing, flushing, disinfection, and final location records.
22.13.00
Facility Sanitary Sewerage
Focuses on buried and above-grade drainage piping, slope and invert control, bedding, joints, cleanouts, interceptors, manholes, ejector systems, access, testing, and record documentation.
22.34.36
Commercial Gas Domestic Water Heaters
Verifies heater selection, bases and anchorage, gas-train components, venting, relief protection, potable-water connections, controls, safeties, operational testing, training, and closeout.
22.42.00
Commercial Plumbing Fixtures
Covers fixture rough-ins, carriers, supports, traps, stops, backflow protection, tempering, accessibility, finishes, sensor controls, functional flow, drainage, and leak testing.
The Division 22 checklist index brings plumbing-related inspection templates into one place so project teams can select the sections that match their contract documents and field scope. Each template can be tailored to the approved products, project details, inspection hold points, testing responsibilities, and turnover requirements applicable to the work.
| Spec Section | Title | Description |
|---|---|---|
| 22.00.00 | Plumbing | Plumbing describing equipment, materials, and methods necessary to provide a complete, code-compliant installation integrated with adjacent systems. Activities coordinated with other trades and verified prior to acceptance. |
| 22.01.00 | Operation and Maintenance of Plumbing | Operation and Maintenance of Plumbing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes plumbing, documentation, each, piping, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. |
| 22.01.10 | Operation and Maintenance of Plumbing Piping and Pumps | Operation and Maintenance of Plumbing Piping and Pumps addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, pump, specified, with field verification confirming compliance with performance, safety, and quality standards. |
| 22.01.10.16 | Video Piping Inspections | Video Piping Inspections addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pipe, inspection, distance, video, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.01.10.51 | Plumbing Piping Cleaning | Plumbing Piping Cleaning addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes flushing, piping, discharge, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.01.10.61 | Plumbing Piping Repairs | Plumbing Piping Repairs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, pipe, repaired, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.01.10.62 | Plumbing Piping Relining | Plumbing Piping Relining addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes liner, testing, pipe, manufacturer’s, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.22.30 | Operation and Maintenance of Plumbing Equipment | Operation and Maintenance of Plumbing Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes values, testing, maintenance, all, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.22.40 | Operation and Maintenance of Plumbing Fixtures | Operation and Maintenance of Plumbing Fixtures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fixture, documentation, maintenance, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. |
| 22.22.50 | Operation and Maintenance of Pool and Fountain Plumbing Systems | Operation and Maintenance of Pool and Fountain Plumbing Systems addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, maintenance, isolation, filter, with field verification confirming compliance with performance, safety, and quality standards. |
| 22.22.60 | Operation and Maintenance of Laboratory and Healthcare Systems | Operation and Maintenance of Laboratory and Healthcare Systems addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes documentation, laboratory, parts, controls, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 22.22.00 | Common Work Results for Plumbing | Common Work Results for Plumbing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, pipe, water, before, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.22.05 | Selective Demolition for Plumbing | Selective Demolition for Plumbing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes demolition, pipe, removed, plumbing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.22.13 | Common Motor Requirements for Plumbing Equipment | Common Motor Requirements for Plumbing Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes motor, rating, nameplate, voltage, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.22.16 | Expansion Fittings and Loops for Plumbing Piping | Expansion Fittings and Loops for Plumbing Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes expansion, movement, pipe, fittings, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.22.17 | Sleeves and Sleeve Seals for Plumbing Piping | Sleeves and Sleeve Seals for Plumbing Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes sleeve, pipe, specified, annular, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.22.19 | Meters and Gages for Plumbing Piping | Meters and Gages for Plumbing Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, gages, gage, meters, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.22.23 | General-Duty Valves for Plumbing Piping | General-Duty Valves for Plumbing Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, service, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.22.29 | Hangers and Supports for Plumbing Piping and Equipment | Hangers and Supports for Plumbing Piping and Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes hanger, pipe, fastening, insulation, with field verification confirming compliance with performance, safety, and quality standards. |
| 22.22.33 | Heat Tracing for Plumbing Piping | Heat Tracing for Plumbing Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes cable, heattrace, insulation, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.22.48 | Vibration and Seismic Controls for Plumbing Piping and Equipment | Vibration and Seismic Controls for Plumbing Piping and Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes seismic, pipe, hangers, piping, with field verification confirming compliance with performance, safety, and quality standards. |
| 22.05.48.13 | Vibration Controls for Plumbing Piping and Equipment | Vibration Controls for Plumbing Piping and Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes isolation, deflection, spring, vibration, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.05.53 | Identification for Plumbing Piping and Equipment | Identification for Plumbing Piping and Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pipe, piping, markers, water, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.05.73 | Facility Drainage Manholes | Facility Drainage Manholes addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes manhole, testing, inches, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.05.76 | Facility Drainage Piping Cleanouts | Facility Drainage Piping Cleanouts addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes cleanout, cleanouts, covers, finished, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.06.00 | Schedules for Plumbing | Schedules for Plumbing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, fixture, plumbing, approved, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 22.06.10 | Schedules for Plumbing Piping and Pumps | Schedules for Plumbing Piping and Pumps addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, testing, piping, pump, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 22.06.10.13 | Plumbing Pump Schedule | Plumbing Pump Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, scheduling, scheduled, motor, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 22.06.12 | Schedules for Facility Potable Water Storage | Schedules for Facility Potable Water Storage addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, testing, scheduled, tank, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 22.06.15 | Schedules for General Service Compressed- Air Equipment | Schedules for General Service Compressed-Air Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, testing, scheduled, meet, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 22.06.30 | Schedules for Plumbing Equipment | Schedules for Plumbing Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, match, testing, field, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 22.06.30.13 | Domestic Water Heater Schedule | Domestic Water Heater Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduled, water, heater, scheduling, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 22.06.40 | Schedules for Plumbing Fixtures | Schedules for Plumbing Fixtures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, fixture, water, each, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 22.06.40.13 | Plumbing Fixture Schedule | Plumbing Fixture Schedule addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, fixture, fixtures, each, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 22.06.50 | Schedules for Pool and Fountain Plumbing Systems | Schedules for Pool and Fountain Plumbing Systems addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, piping, pool, testing, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 22.06.60 | Schedules for Laboratory and Healthcare Systems | Schedules for Laboratory and Healthcare Systems addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, testing, each, gas, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 22.07.00 | Plumbing Insulation | Plumbing Insulation addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes insulation, piping, pipe, sealed, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.07.16 | Plumbing Equipment Insulation | Plumbing Equipment Insulation addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes insulation, surfaces, prevent, water, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.07.19 | Plumbing Piping Insulation | Plumbing Piping Insulation addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes insulation, vapor, retarder, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.08.00 | Commissioning of Plumbing | Commissioning of Plumbing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, water, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.09.00 | Instrumentation and Control for Plumbing | Instrumentation and Control for Plumbing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes instrumentation, testing, controls, flow, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 22.09.63 | Medical Gas Alarms | Medical Gas Alarms addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes alarm, panels, testing, power, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.10.00 | Plumbing Piping | Plumbing Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, pipe, required, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.11.00 | Facility Water Distribution | Facility Water Distribution addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, water, distribution, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.11.13 | Facility Water Distribution Piping | Facility Water Distribution Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, pipe, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.11.16 | Domestic Water Piping | Domestic Water Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, pipe, type, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.11.17 | Gray-Water Piping | Gray-Water Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, graywater, testing, pipe, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.11.19 | Domestic Water Piping Specialties | Domestic Water Piping Specialties addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, minimum, relief, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.11.23 | Domestic Water Pumps | Domestic Water Pumps addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, testing, piping, suction, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.11.23.13 | Domestic-Water Packaged Booster Pumps | Domestic-Water Packaged Booster Pumps addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, pump, piping, design, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.11.23.23 | Domestic-Water In- Line Pumps | Domestic-Water In-Line Pumps addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, testing, suction, pipe, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes commissioning activities. |
| 22.11.23.26 | Close-Coupled | Close-Coupled addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, testing, piping, suction, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.11.23.29 | Close-Coupled | Close-Coupled addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, testing, discharge, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.11.23.33 | Separately Coupled | Separately Coupled addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, suction, pump, motor, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.11.23.36 | Separately Coupled | Separately Coupled addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, fastening, suction, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.11.23.43 | Domestic-Water | Domestic-Water addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, suction, testing, motor, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.11.63 | Gray-Water Pumps | Gray-Water Pumps addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, testing, fastening, alignment, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.12.00 | Facility Potable-Water Storage Tanks | Facility Potable-Water Storage Tanks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tank, fastening, testing, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.12.13 | Facility Roof-Mounted | Facility Roof-Mounted addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tank, roof, drain, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.12.16 | Facility Elevated | Facility Elevated addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, minimum, pedestal, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.12.19 | Facility Ground- Mounted | Facility Ground-Mounted addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, testing, tank, shell, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.12.21 | Facility Underground Potable-Water Storage Tanks | Facility Underground Potable-Water Storage Tanks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, tank, testing, thickness, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.12.23 | Facility Indoor Potable- Water Storage Tanks | Facility Indoor Potable-Water Storage Tanks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tank, testing, piping, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.12.23.13 | Facility Steel | Facility Steel addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, tank, piping, mawp, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.12.23.16 | Facility Steel | Facility Steel addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, tank, specified, interior, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.12.23.23 | Facility Plastic | Facility Plastic addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, tank, fastening, working, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.12.23.26 | Facility Plastic | Facility Plastic addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tank, outlet, drain, inlet, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.00 | Facility Sanitary Sewerage | Facility Sanitary Sewerage addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pipe, sewer, specified, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.13 | Facility Sanitary Sewers | Facility Sanitary Sewers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pipe, not, testing, sewer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.16 | Sanitary Waste and Vent Piping | Sanitary Waste and Vent Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, sanitary, waste, vent, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.19 | Sanitary Waste Piping Specialties | Sanitary Waste Piping Specialties addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, bodies, floor, drain, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.19.13 | Sanitary Drains | Sanitary Drains addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes drain, testing, water, sanitary, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.19.23 | Fats | Fats addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes interceptor, grease, piping, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.19.26 | Grease Removal Devices | Grease Removal Devices addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes interceptor, grease, device, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.19.33 | Backwater Valves | Backwater Valves addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, body, testing, downstream, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.19.36 | Air-Admittance Valves | Air-Admittance Valves addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, not, code, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.23 | Sanitary Waste Interceptors | Sanitary Waste Interceptors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes interceptor, inlet, outlet, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.26 | Sanitary Waste Separators | Sanitary Waste Separators addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes separator, unit, testing, inlet, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.29 | Sanitary Sewerage Pumps | Sanitary Sewerage Pumps addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, piping, flow, alignment, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.29.13 | Wet-Pit-Mounted | Wet-Pit-Mounted addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, specified, motor, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.29.16 | Submersible Sewerage Pumps | Submersible Sewerage Pumps addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, testing, flow, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.29.23 | Sewerage Pump Reverse-Flow Assemblies | Sewerage Pump Reverse-Flow Assemblies addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes assembly, testing, piping, pump, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.29.33 | Sewerage Pump Basins and Pits | Sewerage Pump Basins and Pits addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes basin, piping, specified, dewatering, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.33 | Packaged | Packaged addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, specified, controls, nameplate, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 22.13.36 | Packaged | Packaged addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, specified, piping, alignment, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.43 | Facility Packaged Sewage Pumping Stations | Facility Packaged Sewage Pumping Stations addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, stainless, wetwell, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.43.13 | Facility Dry-Well Packaged Sewage Pumping Stations | Facility Dry-Well Packaged Sewage Pumping Stations addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, manufacturer, alignment, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.43.16 | Facility Wet-Well Packaged Sewage Pumping Stations | Facility Wet-Well Packaged Sewage Pumping Stations addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, testing, wetwell, grade, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.13.63 | Facility Gray Water Tanks | Facility Gray Water Tanks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tank, testing, alignment, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.00 | Facility Storm Drainage | Facility Storm Drainage addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, pipe, testing, stormdrainage, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.13 | Facility Storm Drainage Piping | Facility Storm Drainage Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pipe, testing, specified, storm, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.16 | Rainwater Leaders | Rainwater Leaders addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes leader, leaders, pipe, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.19 | Sump Pump Discharge Piping | Sump Pump Discharge Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, discharge, pump, pipe, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.23 | Storm Drainage Piping Specialties | Storm Drainage Piping Specialties addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, storm, dewatering, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.26 | Facility Storm Drains | Facility Storm Drains addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes drain, testing, minimum, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.26.13 | Roof Drains | Roof Drains addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes drain, deck, testing, drainage, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.26.16 | Facility Area Drains | Facility Area Drains addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes drain, testing, piping, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.26.19 | Facility Trench Drains | Facility Trench Drains addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes channels, testing, concrete, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.29 | Sump Pumps | Sump Pumps addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, piping, testing, prevent, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.29.13 | Wet-Pit-Mounted | Wet-Pit-Mounted addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, fastening, alignment, motor, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.29.16 | Submersible Sump Pumps | Submersible Sump Pumps addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, testing, discharge, dewatering, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.29.19 | Sump-Pump Basins and Pits | Sump-Pump Basins and Pits addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes basin, pump, alignment, dewatering, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.33 | Packaged | Packaged addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, testing, piping, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.36 | Packaged | Packaged addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, testing, basin, controls, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 22.14.53 | Rainwater Storage Tanks | Rainwater Storage Tanks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tank, minimum, coatings, compacted, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.14.63 | Facility Storm-Water Retention Tanks | Facility Storm-Water Retention Tanks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tank, testing, specified, overflow, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.15.00 | General Service Compressed-Air Systems | General Service Compressed-Air Systems addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, compressor, drain, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.15.13 | General Service Compressed-Air Piping | General Service Compressed-Air Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, pipe, piping, working, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.15.16 | General Service Compressed-Air Valves | General Service Compressed-Air Valves addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, service, each, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.15.19 | General Service Packaged Air Compressors and Receivers | General Service Packaged Air Compressors and Receivers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, manufacturer, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.15.19.13 | General Service Packaged Reciprocating Air Compressors | General Service Packaged Reciprocating Air Compressors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, compressor, piping, alignment, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.15.19.16 | General Service Packaged Liquid-Ring Air Compressors | General Service Packaged Liquid-Ring Air Compressors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, motor, compressor, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.15.19.19 | General Service Packaged Rotary- Screw Air Compressors | General Service Packaged Rotary-Screw Air Compressors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, compressor, fullload, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.15.19.23 | General Service Packaged Sliding-Vane Air Compressors | General Service Packaged Sliding-Vane Air Compressors addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, discharge, compressor, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.30.00 | Plumbing Equipment | Plumbing Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, outlet, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.31.00 | Domestic Water Softeners | Domestic Water Softeners addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, softener, flow, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.31.13 | Residential Domestic Water Softeners | Residential Domestic Water Softeners addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, resin, flow, softener, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.31.16 | Commercial Domestic Water Softeners | Commercial Domestic Water Softeners addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, manufacturer, service, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.32.00 | Domestic Water Filtration Equipment | Domestic Water Filtration Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes filter, housing, testing, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.32.13 | Domestic-Water Bag- Type Filters | Domestic-Water Bag-Type Filters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes housing, filter, testing, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.32.16 | Domestic-Water Freestanding Cartridge Filters | Domestic-Water Freestanding Cartridge Filters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, filter, housing, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.32.19 | Domestic-Water Off- Floor Cartridge Filters | Domestic-Water Off-Floor Cartridge Filters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes filter, testing, housing, cartridge, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.32.23 | Domestic-Water Carbon Filters | Domestic-Water Carbon Filters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, vessel, piping, filter, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.32.26 | Domestic-Water Sand Filters | Domestic-Water Sand Filters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes filter, vessel, testing, media, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. |
| 22.32.26.13 | Domestic-Water Circulating Sand Filters | Domestic-Water Circulating Sand Filters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, vessel, filter, backwash, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.32.26.16 | Domestic-Water Multimedia Sand Filters | Domestic-Water Multimedia Sand Filters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, specified, filter, media, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.32.26.19 | Domestic-Water Greensand Filters | Domestic-Water Greensand Filters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, backwash, specified, vessel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.33.00 | Electric Domestic Water Heaters | Electric Domestic Water Heaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes heater, piping, water, approved, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.33.13 | Instantaneous Electric Domestic Water Heaters | Instantaneous Electric Domestic Water Heaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, heater, testing, water, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.33.13.13 | Flow-Control | Flow-Control addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes heater, service, piping, electrical, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.33.13.16 | Thermostat-Control | Thermostat-Control addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes heater, piping, minimum, inches, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.33.30 | Residential | Residential addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, tank, heater, outlet, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.33.30.13 | Residential | Residential addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, heater, testing, water, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.33.30.16 | Residential | Residential addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes heater, tank, water, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.33.30.23 | Residential | Residential addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes collector, piping, loop, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.33.30.26 | Residential | Residential addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tank, testing, piping, pump, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.33.33 | Light-Commercial Electric Domestic Water Heaters | Light-Commercial Electric Domestic Water Heaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes heater, manufacturer, piping, oriented, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.33.36 | Commercial Domestic Water Electric Booster Heaters | Commercial Domestic Water Electric Booster Heaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, heater, inches, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.33.36.13 | Commercial Domestic Water Electric Booster Heaters | Commercial Domestic Water Electric Booster Heaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, temperature, booster, heater, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.33.36.16 | Commercial Storage Electric Domestic Water Heaters | Commercial Storage Electric Domestic Water Heaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, heater, testing, coldwater, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.00 | Fuel-Fired Domestic Water Heaters | Fuel-Fired Domestic Water Heaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes manufacturer, piping, testing, code, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.13 | Instantaneous | Instantaneous addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, manufacturer, heater, unit, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.30 | Residential Gas Domestic Water Heaters | Residential Gas Domestic Water Heaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, tank, water, rating, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.30.13 | Residential | Residential addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, minimum, testing, gas, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.30.16 | Residential | Residential addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, gas, testing, heater, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.30.19 | Residential | Residential addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, heater, gas, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.36 | Commercial Gas Domestic Water Heaters | Commercial Gas Domestic Water Heaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, heater, service, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.36.13 | Commercial | Commercial addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes manufacturer, piping, approved, gas, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.36.16 | Commercial | Commercial addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, manufacturer, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.36.19 | Commercial | Commercial addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, heater, testing, approved, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.36.23 | Commercial | Commercial addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, heater, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.36.26 | Commercial | Commercial addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, heater, water, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.36.29 | Commercial | Commercial addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, heater, finnedtube, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.46 | Oil-Fired Domestic Water Heaters | Oil-Fired Domestic Water Heaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes water, piping, heater, approved, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.46.13 | Large-Capacity | Large-Capacity addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, tank, piping, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.34.56 | Dual-Fuel-Fired Domestic Water Heaters | Dual-Fuel-Fired Domestic Water Heaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, oil, input, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.35.00 | Domestic Water Heat Exchangers | Domestic Water Heat Exchangers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, exchanger, heat, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.35.13 | Instantaneous Domestic Water Heat Exchangers | Instantaneous Domestic Water Heat Exchangers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, exchanger, heat, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 22.35.13.13 | Heating-Fluid-in-Coil | Heating-Fluid-in-Coil addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, heatingfluid, outlet, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.35.13.16 | Domestic-Water-in- Coil | Domestic-Water-in-Coil addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, domesticwater, exchanger, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.35.13.19 | Heating-Fluid-in-U- Tube-Coil | Heating-Fluid-in-U-Tube-Coil addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, domestic, water, side, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.35.23 | Circulating | Circulating addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes heatexchanger, piping, testing, potablewater, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.35.23.13 | Circulating | Circulating addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, minimum, domesticwater, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.35.23.16 | Circulating | Circulating addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, storage, heat, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.35.29 | Noncirculating | Noncirculating addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, domesticwater, heat, exchanger, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.35.29.13 | Noncirculating | Noncirculating addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, domesticwater, testing, connections, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.35.29.16 | Noncirculating | Noncirculating addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, tank, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.35.36 | Domestic Water Brazed-Plate Heat Exchangers | Domestic Water Brazed-Plate Heat Exchangers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, exchanger, heat, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.35.39 | Domestic Water Frame-and-Plate Heat Exchangers | Domestic Water Frame-and-Plate Heat Exchangers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, both, temperature, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.35.43 | Domestic Water Heat Reclaimers | Domestic Water Heat Reclaimers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, specified, domestic, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.36.00 | Domestic Water Preheaters | Domestic Water Preheaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vessel, preheater, approved, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.36.13 | Solar Domestic Water Preheaters | Solar Domestic Water Preheaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes solar, piping, testing, loop, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.36.23 | Geothermal Domestic Water Preheaters | Geothermal Domestic Water Preheaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes preheater, piping, testing, geothermal, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.40.00 | Plumbing Fixtures | Plumbing Fixtures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes water, fixture, piping, fixtures, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.41.00 | Residential Plumbing Fixtures | Residential Plumbing Fixtures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, fixture, piping, floor, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.41.13 | Residential Water Closets | Residential Water Closets addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, fastening, fixture, flush, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.41.13.13 | Residential Water Closets | Residential Water Closets addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes closet, flange, finished, wall, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.41.13.16 | Residential Urinals | Residential Urinals addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes flush, testing, urinal, each, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.41.13.19 | Residential Bidets | Residential Bidets addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes bidet, supply, fixture, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.41.16 | Residential Lavatories and Sinks | Residential Lavatories and Sinks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes lavatory, fixture, fastening, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.41.16.13 | Residential Lavatories | Residential Lavatories addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes inch, lavatory, testing, trap, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.41.16.16 | Residential Sinks | Residential Sinks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes sink, drain, approved, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.41.19 | Residential Bathtubs | Residential Bathtubs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tub, testing, inch, overflow, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.41.23 | Residential Showers | Residential Showers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes shower, testing, receptor, drain, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.41.26 | Residential Disposers | Residential Disposers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes disposer, sink, listed, approved, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.41.36 | Residential Laundry Trays | Residential Laundry Trays addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tray, piping, laundry, fixture, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.41.39 | Residential Faucets | Residential Faucets addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes faucet, testing, supply, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.00 | Commercial Plumbing Fixtures | Commercial Plumbing Fixtures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fixture, piping, testing, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.13 | Commercial Water Closets | Commercial Water Closets addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, fixture, flushometer, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.13.13 | Commercial Water Closets | Commercial Water Closets addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, inches, flush, water, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.13.16 | Commercial Urinals | Commercial Urinals addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes urinal, flush, piping, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.16 | Commercial Lavatories and Sinks | Commercial Lavatories and Sinks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fixture, minimum, testing, water, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.16.13 | Commercial Lavatories | Commercial Lavatories addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes lavatory, testing, supply, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.16.16 | Commercial Sinks | Commercial Sinks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes sink, piping, specified, supply, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.19 | Commercial Bathtubs | Commercial Bathtubs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tub, drain, minimum, framing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.23 | Commercial Showers | Commercial Showers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes shower, piping, head, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.26 | Commercial Disposers | Commercial Disposers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes disposer, electrical, testing, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.29 | Shampoo Bowls | Shampoo Bowls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes bowl, testing, piping, shampoo, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.33 | Wash Fountains | Wash Fountains addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes flow, specified, fixture, floor, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.36 | Commercial Laundry Trays | Commercial Laundry Trays addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tray, laundry, inch, water, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.39 | Commercial Faucets | Commercial Faucets addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes faucet, supply, fixture, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.42.43 | Flushometers | Flushometers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, fixture, flushometer, water, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.43.00 | Healthcare Plumbing Fixtures | Healthcare Plumbing Fixtures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fixture, water, fixtures, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.43.13 | Healthcare Water Closets | Healthcare Water Closets addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fixture, closet, testing, dewatering, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.43.16 | Healthcare Sinks | Healthcare Sinks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes sink, accessible, hot, supply, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.43.19 | Healthcare Bathtubs | Healthcare Bathtubs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, bathtub, piping, tub, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.43.23 | Healthcare Showers | Healthcare Showers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes shower, testing, inches, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.43.39 | Healthcare Faucets | Healthcare Faucets addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes faucet, piping, outlet, flow, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.43.43 | Healthcare Plumbing Fixture Flushometers | Healthcare Plumbing Fixture Flushometers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes flushometer, testing, fixture, flush, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 22.45.00 | Emergency Plumbing Fixtures | Emergency Plumbing Fixtures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes emergency, testing, flow, fixture, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.45.13 | Emergency Showers | Emergency Showers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes shower, piping, emergency, above, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.45.16 | Eyewash Equipment | Eyewash Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes spray, heads, piping, eyewash, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.45.19 | Self-Contained Eyewash Equipment | Self-Contained Eyewash Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes flow, unit, floor, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.45.23 | Personal Eyewash Equipment | Personal Eyewash Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes eyewash, activation, unit, floor, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.45.26 | Eye/Face Wash Equipment | Eye/Face Wash Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes unit, flow, piping, safety, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.45.29 | Hand-Held Emergency Drench Hoses | Hand-Held Emergency Drench Hoses addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes hose, remains, water, temperature, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.45.33 | Combination Emergency Fixture Units | Combination Emergency Fixture Units addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes eyewash, piping, shower, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.45.36 | Emergency Fixture Water-Tempering Equipment | Emergency Fixture Water-Tempering Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, flow, mixing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.46.00 | Security Plumbing Fixtures | Security Plumbing Fixtures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fixture, security, fixtures, stainless, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.46.13 | Security Water Closets and Urinals | Security Water Closets and Urinals addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fixture, testing, piping, carrier, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.46.13.13 | Security Water Closets | Security Water Closets addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes flush, fixture, piping, weld, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.46.13.16 | Security Urinals | Security Urinals addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, fastening, fixture, flush, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.46.16 | Security Lavatories and Sinks | Security Lavatories and Sinks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fixture, security, screws, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.46.16.13 | Security Lavatories | Security Lavatories addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes lavatory, security, piping, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.46.16.16 | Security Sinks | Security Sinks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes sink, specified, security, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.46.19 | Security Showers | Security Showers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fixture, security, testing, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.46.39 | Security Faucets | Security Faucets addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, specified, faucet, spout, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.46.43 | Security Plumbing Fixture Flushometers | Security Plumbing Fixture Flushometers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes flushometer, supply, piping, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 22.46.53 | Security Plumbing Fixture Supports | Security Plumbing Fixture Supports addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fixture, carrier, fastening, supports, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.47.00 | Drinking Fountains and Water Coolers | Drinking Fountains and Water Coolers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes floor, bubbler, water, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.47.13 | Drinking Fountains | Drinking Fountains addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, fountain, supply, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.47.16 | Pressure Water Coolers | Pressure Water Coolers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, flow, floor, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.47.19 | Water-Station Water Coolers | Water-Station Water Coolers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes water, cooler, testing, clearance, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.47.23 | Remote Water Coolers | Remote Water Coolers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes cooler, water, piping, flow, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.50.00 | Pool and Fountain Plumbing Systems | Pool and Fountain Plumbing Systems addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, pool, pipe, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.51.00 | Swimming Pool Plumbing Systems | Swimming Pool Plumbing Systems addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, pool, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.51.13 | Swimming Pool Piping | Swimming Pool Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, pool, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.51.16 | Swimming Pool Pumps | Swimming Pool Pumps addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, testing, specified, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.51.19 | Swimming Pool Water Treatment Equipment | Swimming Pool Water Treatment Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes flow, chemical, piping, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.51.23 | Swimming Pool Equipment Controls | Swimming Pool Equipment Controls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes controls, panel, specified, pool, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 22.52.00 | Fountain Plumbing Systems | Fountain Plumbing Systems addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, pump, fountain, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.52.13 | Fountain Piping | Fountain Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, pipe, fountain, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.52.16 | Fountain Pumps | Fountain Pumps addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pump, alignment, testing, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.52.19 | Fountain Water Treatment Equipment | Fountain Water Treatment Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, treatment, piping, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.52.23 | Fountain Equipment Controls | Fountain Equipment Controls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes controls, fountain, testing, panel, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 22.60.00 | Gas and Vacuum Systems for Laboratory and Healthcare Facilities | Gas and Vacuum Systems for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, gas, copper, with field verification confirming compliance with performance, safety, and quality standards. |
| 22.61.00 | Compressed-Air Systems for Laboratory and Healthcare Facilities | Compressed-Air Systems for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, copper, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.61.13 | Compressed-Air Piping for Laboratory and Healthcare Facilities | Compressed-Air Piping for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, pipe, joints, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.61.13.53 | Laboratory Compressed-Air Piping | Laboratory Compressed-Air Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, copper, pipe, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.61.13.70 | Healthcare Compressed-Air Piping | Healthcare Compressed-Air Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, tube, medical, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.61.13.74 | Dental Compressed- Air Piping | Dental Compressed-Air Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, air, service, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.61.19 | Compressed-Air Equipment for Laboratory and Healthcare Facilities | Compressed-Air Equipment for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, receiver, discharge, dew, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.61.19.53 | Laboratory Compressed-Air Equipment | Laboratory Compressed-Air Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, compressor, psi, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.61.19.70 | Healthcare Compressed-Air Equipment | Healthcare Compressed-Air Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, medical, air, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.61.19.74 | Dental Compressed- Air Equipment | Dental Compressed-Air Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, compressor, air, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.62.00 | Vacuum Systems for Laboratory and Healthcare Facilities | Vacuum Systems for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vacuum, piping, during, copper, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.62.13 | Vacuum Piping for Laboratory and Healthcare Facilities | Vacuum Piping for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vacuum, piping, copper, prevent, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.62.13.53 | Laboratory Vacuum Piping | Laboratory Vacuum Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vacuum, piping, copper, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.62.13.70 | Healthcare | Healthcare addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vacuum, piping, medical, not, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.62.13.74 | Dental Vacuum Piping | Dental Vacuum Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vacuum, piping, not, tube, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.62.19 | Vacuum Equipment for Laboratory and Healthcare Facilities | Vacuum Equipment for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vacuum, testing, pump, receiver, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.62.19.53 | Laboratory Vacuum Equipment | Laboratory Vacuum Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, vacuum, pump, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.62.19.70 | Healthcare Vacuum Equipment | Healthcare Vacuum Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vacuum, pump, pumps, service, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.62.19.74 | Dental Vacuum and Evacuation Equipment | Dental Vacuum and Evacuation Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes vacuum, piping, pump, suction, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.62.23 | Waste Anesthesia-Gas Piping | Waste Anesthesia-Gas Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, waste, joints, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.63.00 | Gas Systems for Laboratory and Healthcare Facilities | Gas Systems for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, gas, continuous, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.63.13 | Gas Piping for Laboratory and Healthcare Facilities | Gas Piping for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes gas, testing, each, piping, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.63.13.53 | Laboratory Gas Piping | Laboratory Gas Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, gas, nitrogen, service, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.63.13.70 | Healthcare Gas Piping | Healthcare Gas Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, each, tube, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.63.19 | Gas Storage Tanks for Laboratory and Healthcare Facilities | Gas Storage Tanks for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tank, piping, testing, gas, with field verification confirming compliance with performance, safety, and quality standards. |
| 22.63.19.53 | Laboratory Gas Storage Tanks | Laboratory Gas Storage Tanks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tank, testing, piping, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.63.19.70 | Healthcare Gas Storage Tanks | Healthcare Gas Storage Tanks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes storage, piping, bulk, room, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.66.00 | Chemical-Waste Systems for Laboratory and Healthcare Facilities | Chemical-Waste Systems for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, chemicalwaste, testing, listed, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.66.53 | Laboratory Chemical- Waste and Vent Piping | Laboratory Chemical-Waste and Vent Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, chemicalwaste, testing, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.66.70 | Healthcare Chemical- Waste and Vent Piping | Healthcare Chemical-Waste and Vent Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pipe, piping, chemicalwaste, vent, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.66.83 | Chemical-Waste Tanks | Chemical-Waste Tanks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tank, specified, fastening, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.66.83.13 | Chemical-Waste Dilution Tanks | Chemical-Waste Dilution Tanks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tank, testing, piping, dilution, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.66.83.16 | Chemical-Waste Neutralization Tanks | Chemical-Waste Neutralization Tanks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes tank, fastening, piping, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.67.00 | Processed Water Systems for Laboratory and Healthcare Facilities | Processed Water Systems for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, processedwater, specified, with field verification confirming compliance with performance, safety, and quality standards. |
| 22.67.13 | Processed Water Piping for Laboratory and Healthcare Facilities | Processed Water Piping for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, stainless, fusion, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. |
| 22.67.13.13 | Distilled-Water Piping | Distilled-Water Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, stainlesssteel, branch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.67.13.16 | Reverse-Osmosis Water Piping | Reverse-Osmosis Water Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, pipe, minimum, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.67.13.19 | Deionized-Water Piping | Deionized-Water Piping addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes piping, testing, resistivity, pipe, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.67.19 | Processed Water Equipment for Laboratory and Healthcare Facilities | Processed Water Equipment for Laboratory and Healthcare Facilities addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, specified, processedwater, with field verification confirming compliance with performance, safety, and quality standards. |
| 22.67.19.13 | Distilled-Water Equipment | Distilled-Water Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, specified, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.67.19.16 | Reverse-Osmosis Water Equipment | Reverse-Osmosis Water Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, piping, permeate, operating, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 22.67.19.19 | Deionized-Water Equipment | Deionized-Water Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, piping, testing, tanks, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
MasterSpec® and MasterFormat® are registered trademarks. This blog references section numbers and titles for clarity only and does not reproduce proprietary content. Copyright FTQ360.

QC Hydraulic Cement Underlayment Checklist – Section 03.54.16
Section 03.54.16 covers hydraulic-cement-based underlayments used to level, patch, or resurface floors prior to…

QC Gypsum Cement Underlayment Checklist – Section 03.54.13
Section 03.54.13 covers gypsum cement underlayments used for leveling, sound control, and substrate preparation…

QC Concrete Topping Checklist – Section 03.53.00
Section 03.53.00 covers bonded and unbonded concrete toppings used to improve flatness, restore level, or provide….