Menu Close
- CONSTRUCTION
- HOMEBUILDER
- ENERGY
- MORE
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
- SAFETY APP
- CONSTRUCTION
- HOMEBUILDER
- ENERGY
- MORE
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
- SAFETY APP
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
resources
CHECKLISTS
GOALS
ABOUT US
CONTACT US
The Division 35 checklist index brings every existing conditions checklist into one place. Use this index to navigate the full list of existing conditions checklists available on the FTQ360 inspection and QAQC platform.
| Spec Section | Title | Description |
|---|---|---|
| 35.00.00 | Waterway and Marine Construction | Waterway and Marine Construction describing equipment, materials, and methods necessary to provide a complete, code- compliant installation integrated with adjacent systems. Activities coordinated with other trades and verified prior to acceptance. |
| 35.01.00 | Operation and Maintenance of Waterway and Marine Construction | Operation and Maintenance of Waterway and Marine Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, exceeding, area, during, with field verification confirming compliance with performance, safety, and quality standards. |
| 35.01.30 | Operation and Maintenance of Coastal Construction | Operation and Maintenance of Coastal Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes armor, units, specified, structure, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.05.05 | Operation and Maintenance of Waterway Construction | Operation and Maintenance of Waterway Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes maintenance, navigation, channel, required, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.05.30 | Waterway Dredging | Waterway Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes channel, required, each, dredge, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.06.30 | Preservation of Water Courses | Preservation of Water Courses addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes water, turbidity, approved, permit, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.08.30 | Operation and Maintenance of Marine Construction | Operation and Maintenance of Marine Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes percent, testing, loss, than, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.11.13 | Marine Dredging | Marine Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes dredge, dredging, daily, each, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.12.13 | Channel Excavation | Channel Excavation addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes excavation, channel, daily, disposal, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.01.70 | Operation and Maintenance of Dams | Operation and Maintenance of Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes spillway, dam, free, crest, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.05.00 | Common Work Results for Waterway and Marine Construction | Common Work Results for Waterway and Marine Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes water, turbidity, floating, before, with field verification confirming compliance with performance, safety, and quality standards. |
| 35.05.05 | Selective Demolition for Waterway and Marine Construction | Selective Demolition for Waterway and Marine Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes demolition, debris, active, limits, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.05.30 | Common Work Results for Coastal Construction | Common Work Results for Coastal Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, coastal, water, prevent, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.06.30 | Common Work Results for Waterway Construction | Common Work Results for Waterway Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes floating, fuel, pads, daily, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.08.30 | Common Work Results for Marine Construction | Common Work Results for Marine Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, marine, steel, after, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.11.13 | Common Work Results for Dams | Common Work Results for Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, placement, specified, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.12.13 | Schedules for Waterway and Marine Construction | Schedules for Waterway and Marine Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, days, activity, baseline, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 35.06.30 | Schedules for Coastal Construction | Schedules for Coastal Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, activity, coastal, construction, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 35.08.30 | Schedules for Waterway Construction | Schedules for Waterway Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, submitted, activities, update, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 35.11.13 | Schedules for Marine Construction | Schedules for Marine Construction coordinating delivery, installation sequencing, testing, and outage planning to align with project requirements. Activities coordinated with other trades and verified prior to acceptance. |
| 35.12.13 | Schedules for Dams | Schedules for Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes scheduling, activities, baseline, update, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes coordinated schedules. |
| 35.08.00 | Commissioning of Waterway and Marine Construction | Commissioning of Waterway and Marine Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, hydraulic, all, specified, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.08.30 | Commissioning of Coastal Construction | Commissioning of Coastal Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes documentation, survey, armor, specified, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. |
| 35.11.13 | Commissioning of Waterway Construction | Commissioning of Waterway Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, specified, controls, documentation, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.12.13 | Commissioning of Marine Construction | Commissioning of Marine Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, design, instrumentation, mooring, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.08.70 | Commissioning of Dams | Commissioning of Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes full, during, testing, gates, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.10.00 | Waterway and Marine Signaling and Control Equipment | Waterway and Marine Signaling and Control Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, testing, field, signal, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.11.00 | Signaling and Control Equipment for Waterways | Signaling and Control Equipment for Waterways addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes controls, electrical, testing, specified, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.11.13 | Signaling Equipment for Waterways | Signaling Equipment for Waterways addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, electrical, controls, required, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.12.13 | Control Equipment for Waterways | Control Equipment for Waterways addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes controls, electrical, testing, specified, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.12.00 | Marine Signaling and Control Equipment | Marine Signaling and Control Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, controls, dewatering, light, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.12.13 | Marine Signaling Equipment | Marine Signaling Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, dewatering, required, marine, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.12.13.13 | Lighthouse Equipment | Lighthouse Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes lantern, fastening, testing, electrical, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.12.33 | Marine Navigation Equipment | Marine Navigation Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, light, specified, elevation, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.12.53 | Marine Control Equipment | Marine Control Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes controls, instrumentation, electrical, power, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.13.00 | Signaling and Control Equipment for Dams | Signaling and Control Equipment for Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes electrical, testing, controls, power, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.13.13 | Signaling Equipment for Dams | Signaling Equipment for Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes signaling, electrical, testing, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.13.53 | Control Equipment for Dams | Control Equipment for Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes controls, electrical, power, testing, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.20.00 | Waterway and Marine Construction and Equipment | Waterway and Marine Construction and Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, specified, pile, steel, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.21.00 | General Fabrications for Waterways | General Fabrications for Waterways addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes coatings, specified, fastening, fabricated, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.21.13 | Hydraulic Bifurcation Panels | Hydraulic Bifurcation Panels addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes panel, specified, plates, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.21.16 | Hydraulic Bulkheads | Hydraulic Bulkheads addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes bulkhead, welds, testing, dewatering, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.21.19 | Hydraulic Manifolds | Hydraulic Manifolds addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, manifold, gauge, port, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.21.23 | Penstocks | Penstocks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, pipe, before, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.21.33 | Trash Racks | Trash Racks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes rack, fastening, trash, frame, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.21.36 | Debris Cages | Debris Cages addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes debris, cage, specified, coatings, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.22.00 | Hydraulic Gates | Hydraulic Gates addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes gate, specified, hydraulic, fully, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.22.13 | Spillway Crest Gates | Spillway Crest Gates addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes gate, fastening, specified, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.22.19 | Hydraulic Head Gates | Hydraulic Head Gates addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes gate, testing, full, hydraulic, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.22.26 | Sluice Gates | Sluice Gates addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes gate, fastening, specified, full, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.22.33 | Miter Gates | Miter Gates addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes gate, specified, fastening, percent, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.22.39 | Sector Gates | Sector Gates addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, gate, design, dewatering, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.22.46 | Tainter Gates | Tainter Gates addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes gate, trunnion, testing, full, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.22.53 | Vertical Lift Hydraulic Gates | Vertical Lift Hydraulic Gates addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, gate, hydraulic, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.22.59 | Hydraulic Closure Gates | Hydraulic Closure Gates addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes gate, inch, specified, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.22.63 | Through-Levee Access Gates | Through-Levee Access Gates addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes gate, design, specified, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.00 | Dredging | Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes dredge, hours, survey, cut, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.13 | Suction Dredging | Suction Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes dredge, survey, contract, operations, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.13.11 | Training Suction Dredging | Training Suction Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes dredge, approved, template, operations, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.13.13 | Cutter Suction Dredging | Cutter Suction Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pipeline, daily, shift, inspection, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.13.16 | Auger Suction Dredging | Auger Suction Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes dredge, shift, each, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.13.23 | Jet-Lift Dredging | Jet-Lift Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pipeline, dredge, testing, during, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.13.26 | Air-Lift Dredging | Air-Lift Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes compressor, testing, air, nozzle, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.21 | Bucket Dredging | Bucket Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes dredge, daily, positioning, bucket, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.23 | Clamshell Dredging | Clamshell Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes bucket, sediment, approved, dredging, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.26 | Backhoe/Dipper Dredging | Backhoe/Dipper Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes survey, before, excavation, bathymetric, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.33 | Water Injection Dredging | Water Injection Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes injection, dredge, operations, nozzle, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.36 | Pneumatic Dredging | Pneumatic Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, dredge, operating, head, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.43 | Bed-Levelling Dredging | Bed-Levelling Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes survey, bedlevelling, design, verified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.46 | Krabbelaar Dredging | Krabbelaar Dredging addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes dredge, each, survey, shift, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.24.53 | Waterway Snag Removal | Waterway Snag Removal addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes removal, snag, limits, protected, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.30.00 | Coastal Construction | Coastal Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes survey, minimum, turbidity, before, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.00 | Shoreline Protection | Shoreline Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes armor, stone, design, filter, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.16 | Seawalls | Seawalls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, specified, minimum, design, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.16.13 | Concrete Seawalls | Concrete Seawalls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, specified, wall, required, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.16.16 | Segmental Seawalls | Segmental Seawalls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes wall, minimum, alignment, placed, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.16.19 | Steel Sheet Piling Seawalls | Steel Sheet Piling Seawalls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes sheet, driving, specified, pile, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.16.23 | Timber Seawalls | Timber Seawalls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, design, timber, piles, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.16.40 | Stone Seawalls | Stone Seawalls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes stone, design, specified, foundation, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.19 | Revetments | Revetments addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes design, placement, slope, armor, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.19.13 | Sacked Cement-Sand Revetments | Sacked Cement-Sand Revetments addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes sacks, sack, revetment, placement, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.19.16 | Concrete Unit Masonry Revetments | Concrete Unit Masonry Revetments addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes revetment, specified, units, concrete, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.19.36 | Gabion Revetments | Gabion Revetments addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes baskets, basket, wire, stone, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.19.40 | Stone Revetments | Stone Revetments addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes stone, armor, stones, crest, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.23 | Breakwaters | Breakwaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes design, stone, survey, armour, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.23.13 | Rubble Mound Breakwaters | Rubble Mound Breakwaters addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes armor, survey, layer, placement, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.23.16 | Precast Breakwater Modules | Precast Breakwater Modules addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes module, specified, modules, design, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.26 | Jetties | Jetties addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, armor, design, survey, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.26.13 | Concrete Jetties | Concrete Jetties addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, approved, reinforcement, placement, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.26.16 | Concrete Unit Masonry Jetties | Concrete Unit Masonry Jetties addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, units, elevation, placement, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.26.36 | Gabion Jetties | Gabion Jetties addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes basket, gabion, design, jetty, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.26.40 | Stone Jetties | Stone Jetties addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes armor, jetty, stone, design, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.29 | Groins | Groins addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes design, layer, placed, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.29.13 | Concrete Groins | Concrete Groins addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes design, concrete, specified, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.29.16 | Concrete Unit Masonry Groins | Concrete Unit Masonry Groins addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes minimum, groin, concrete, inches, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.29.26 | Steel Groins | Steel Groins addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, pile, design, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.29.36 | Gabion Groins | Gabion Groins addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes wire, gabion, groin, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.31.29.40 | Stone Groins | Stone Groins addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes stone, groin, placement, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.32.00 | Artificial Reefs | Artificial Reefs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes deployment, module, modules, reef, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.32.13 | Scrap Material Artificial Reefs | Scrap Material Artificial Reefs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes reef, scrap, diver, modules, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.32.13.13 | Scrap Concrete Artificial Reefs | Scrap Concrete Artificial Reefs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, scrap, units, than, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.32.13.19 | Scrap Steel Artificial Reefs | Scrap Steel Artificial Reefs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes module, specified, deployment, design, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.32.13.33 | Sunken Ship Artificial Reefs | Sunken Ship Artificial Reefs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes been, reef, locations, engineered, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.32.16 | Constructed Artificial Reefs | Constructed Artificial Reefs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes reef, modules, minimum, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.32.16.13 | Constructed Concrete Artificial Reefs | Constructed Concrete Artificial Reefs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes modules, module, placement, deployment, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.32.16.19 | Constructed Steel Artificial Reefs | Constructed Steel Artificial Reefs addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes reef, deployment, steel, modules, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.40.00 | Waterway Construction and Equipment | Waterway Construction and Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes design, concrete, water, approved, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.41.00 | Levees | Levees addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, foundation, levee, fill, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.41.13 | Landside Levee Berms | Landside Levee Berms addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes berm, specified, lift, fill, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.41.13.13 | Stability Landside Levee Berms | Stability Landside Levee Berms addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes berm, lift, fill, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.41.13.16 | Seepage Landside Levee Berms | Seepage Landside Levee Berms addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes berm, material, specified, before, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.41.16 | Levee Cutoff Trenches | Levee Cutoff Trenches addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes trench, backfill, lift, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.41.19 | Levee Relief Wells | Levee Relief Wells addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes screen, well, minimum, above, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.42.00 | Waterway Bank Protection | Waterway Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes armor, protection, specified, bank, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.42.13 | Piling Bank Protection | Piling Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes driving, pile, testing, controls, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.42.13.19 | Steel Sheet Piling Bank Protection | Steel Sheet Piling Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, driving, wall, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.42.13.23 | Timber Piling Bank Protection | Timber Piling Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pile, length, driving, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.42.13.26 | Plastic Piling Bank Protection | Plastic Piling Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pile, plastic, specified, wall, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.42.29 | Grout-Bag Bank Protection | Grout-Bag Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes grout, bag, design, fabric, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.42.34 | Soil Reinforcement Bank Protection | Soil Reinforcement Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes reinforcement, soil, testing, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.42.35 | Slope Protection Bank Protection | Slope Protection Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes stone, slope, thickness, protection, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.42.36 | Gabion Bank Protection | Gabion Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes gabion, basket, rock, wire, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.42.37 | Riprap Bank Protection | Riprap Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes riprap, specified, placement, layer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.42.53 | Wall Bank Protection | Wall Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes wall, inch, than, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.42.53.16 | Concrete Unit Masonry Wall Bank Protection | Concrete Unit Masonry Wall Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes mortar, wall, specified, placement, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.42.53.19 | Segmental Wall Bank Protection | Segmental Wall Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes wall, design, units, compacted, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.42.53.40 | Stone Wall Bank Protection | Stone Wall Bank Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes wall, design, specified, stones, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.43.00 | Waterway Scour Protection | Waterway Scour Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes armor, specified, layer, stone, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.43.29 | Grout-Bag Scour Protection | Grout-Bag Scour Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes grout, specified, bag, placement, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.43.34 | Soil Reinforcement Scour Protection | Soil Reinforcement Scour Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes reinforcement, specified, cover, soil, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.43.35 | Slope Protection Scour Protection | Slope Protection Scour Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes slope, armor, specified, placement, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.43.36 | Gabion Scour Protection | Gabion Scour Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes gabion, before, basket, baskets, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.43.37 | Riprap Scour Protection | Riprap Scour Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes riprap, filter, specified, layer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.43.53 | Wall Scour Protection | Wall Scour Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes armor, filter, layer, wall, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.43.53.13 | Concrete Unit Masonry Wall Scour Protection | Concrete Unit Masonry Wall Scour Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes wall, specified, concrete, masonry, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.43.53.16 | Segmental Wall Scour Protection | Segmental Wall Scour Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes wall, face, inch, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.43.53.40 | Stone Wall Scour Protection | Stone Wall Scour Protection addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes stone, specified, placement, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.49.00 | Waterway Structures | Waterway Structures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, design, specified, elevations, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.49.13 | Floodwalls | Floodwalls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes design, concrete, wall, joints, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.49.13.13 | Concrete Floodwalls | Concrete Floodwalls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, placement, wall, inch, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.49.13.16 | Masonry Floodwalls | Masonry Floodwalls addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes wall, masonry, inch, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.49.23 | Waterway Locks | Waterway Locks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, lock, embedded, before, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.49.23.13 | Concrete Waterway Locks | Concrete Waterway Locks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes placement, concrete, lock, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.49.23.23 | Piling Waterway Locks | Piling Waterway Locks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pile, driving, specified, wall, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.49.26 | Floodgate Machinery | Floodgate Machinery addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes motor, testing, full, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.50.00 | Marine Construction and Equipment | Marine Construction and Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, concrete, pile, elevation, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.51.00 | Floating Construction | Floating Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, testing, design, floating, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.51.13 | Floating Piers | Floating Piers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, testing, pier, modules, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.51.13.23 | Floating Wood Piers | Floating Wood Piers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, pier, electrical, decking, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.51.13.26 | Floating Plastic Piers | Floating Plastic Piers addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, pier, float, design, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.51.23 | Pontoons | Pontoons addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, specified, weld, required, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.52.00 | Offshore Platform Construction | Offshore Platform Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, fastening, specified, required, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.52.13 | Fixed Offshore Platform Construction | Fixed Offshore Platform Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, testing, verified, tolerance, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.52.23 | Semi-Submersible Offshore Platform Construction | Semi-Submersible Offshore Platform Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, specified, times, coatings, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.52.33 | Floating Offshore Platform Construction | Floating Offshore Platform Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, hull, testing, welds, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.53.00 | Underwater Construction | Underwater Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, underwater, specified, placement, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.53.23 | Underwater Harbor Deepening | Underwater Harbor Deepening addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes depth, dredging, dredge, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.53.33 | Underwater Pipeline Construction | Underwater Pipeline Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, coatings, design, pipe, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.53.43 | Underwater Foundation Construction | Underwater Foundation Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes foundation, concrete, before, placement, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.53.53 | Underwater Structures Construction | Underwater Structures Construction addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, dive, survey, underwater, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.53.63 | Underwater Waterproofing | Underwater Waterproofing addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes waterproofing, dive, water, material, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.00 | Marine Specialties | Marine Specialties addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, specified, marine, fender, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.13 | Marine Fenders | Marine Fenders addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fender, fastening, manufacturer, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.13.13 | Prestressed Concrete Marine Fender Piling | Prestressed Concrete Marine Fender Piling addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes pile, driving, concrete, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.13.16 | Resilient Foam-Filled Marine Fenders | Resilient Foam-Filled Marine Fenders addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fender, fastening, testing, specification, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.13.19 | Rubber Marine Fenders | Rubber Marine Fenders addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, fender, specified, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.23 | Buoys | Buoys addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, design, buoy, mooring, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.23.13 | Mooring Buoys | Mooring Buoys addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes buoy, specified, design, mooring, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.23.16 | Anchor Pendant Buoys | Anchor Pendant Buoys addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes buoy, testing, material, design, with field verification confirming compliance with performance, safety, and quality standards. Additional scope includes documentation deliverables. |
| 35.59.23.19 | Navigation Buoys | Navigation Buoys addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes buoy, specified, color, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.29 | Mooring Devices | Mooring Devices addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, mooring, device, fastening, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.29.13 | Quick-Release Mooring Hooks | Quick-Release Mooring Hooks addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, hook, release, swl, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.29.16 | Laser Docking Systems | Laser Docking Systems addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes instrumentation, power, fastening, range, with field verification confirming compliance with performance, safety, and quality standards. Controls, instrumentation, and integration provided to support monitoring, protection, and interoperability with adjacent systems. |
| 35.59.29.19 | Capstans | Capstans addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, specified, capstan, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.33 | Marine Bollards and Cleats | Marine Bollards and Cleats addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, bollard, cleat, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.33.13 | Cast-Steel Marine Bollards and Cleats | Cast-Steel Marine Bollards and Cleats addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, specified, casting, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.33.16 | Cast-Iron Marine Bollards and Cleats | Cast-Iron Marine Bollards and Cleats addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, specified, testing, minimum, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.33.19 | Stainless-Steel Marine Bollards and Cleats | Stainless-Steel Marine Bollards and Cleats addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, bollards, stainless, testing, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.33.23 | Plastic Marine Bollards and Cleats | Plastic Marine Bollards and Cleats addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes fastening, testing, adhesive, bollard, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.93 | Marine Chain and Accessories | Marine Chain and Accessories addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes chain, testing, specified, inspection, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.93.13 | Marine Chain | Marine Chain addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes chain, links, length, than, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.93.16 | Marine Shackles | Marine Shackles addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes shackle, pin, shackles, manufacturer, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.59.93.19 | Marine Chain Tensioners | Marine Chain Tensioners addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, tensioner, stroke, chain, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.70.00 | Dam Construction and Equipment | Dam Construction and Equipment addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, placement, specified, structural, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.71.00 | Gravity Dams | Gravity Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, lift, foundation, before, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.71.13 | Concrete Gravity Dams | Concrete Gravity Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, placement, lift, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.71.16 | Masonry Gravity Dams | Masonry Gravity Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, lift, grout, foundation, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.71.19 | Rockfill Gravity Dams | Rockfill Gravity Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, rockfill, lift, placement, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.72.00 | Arch Dams | Arch Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, design, placement, before, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.72.13 | Concrete Arch Dams | Concrete Arch Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, placement, specified, before, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.73.00 | Embankment Dams | Embankment Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes embankment, specified, zone, before, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.73.13 | Earth Embankment Dam | Earth Embankment Dam addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, lift, material, placement, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.73.16 | Rock Embankment Dams | Rock Embankment Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes rockfill, lift, specified, before, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.74.00 | Buttress Dams | Buttress Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, foundation, placement, specified, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.74.13 | Concrete Buttress Dams | Concrete Buttress Dams addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes concrete, specified, lift, foundation, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.79.00 | Auxiliary Dam Structures | Auxiliary Dam Structures addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes specified, steel, testing, concrete, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.79.13 | Fish Ladders | Fish Ladders addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes ladder, design, testing, fish, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
| 35.79.13.13 | Concrete Fish Ladders | Concrete Fish Ladders addressing installation, integration, and safe operation of related assemblies and systems for reliable facility performance. Scope emphasizes testing, specified, concrete, design, with field verification confirming compliance with performance, safety, and quality standards. Quality assurance, recordkeeping, and corrective actions documented prior to final acceptance. |
MasterSpec® and MasterFormat® are registered trademarks. This blog references section numbers and titles for clarity only and does not reproduce proprietary content. Copyright FTQ360.

QC Hydraulic Cement Underlayment Checklist – Section 03.54.16
Section 03.54.16 covers hydraulic-cement-based underlayments used to level, patch, or resurface floors prior to…

QC Gypsum Cement Underlayment Checklist – Section 03.54.13
Section 03.54.13 covers gypsum cement underlayments used for leveling, sound control, and substrate preparation…

QC Concrete Topping Checklist – Section 03.53.00
Section 03.53.00 covers bonded and unbonded concrete toppings used to improve flatness, restore level, or provide….